1505 W 44th St
Austin, TX 78756
1505 W 44th St: 1 project on record
City of Austin lists 1 filing across 1 project at 1505 W 44th St, Austin, TX 78756. The most recent, filed January 12, 2024, covers: “Rebuilding oh electric service after a utility service regulation violation notice was left on house”.
Compiled from City of Austin records · updated Jan 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 12, 2024
- since Jan 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRebuilding oh electric service after a utility service regulation violation notice was left on house
- AppliedJan 9, 2024
- IssuedJan 12, 2024
- WorkJan '24 – Apr '24
- Final inspectionApr 29, 2024
Passed final inspection Apr 29, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRebuilding oh electric service after a utility service regulation violation notice was left on house
Rebuilding oh electric service after a utility service regulation violation notice was left on house
City of Austin permitElectrical PermitFinal- Record
- 2024-002566 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1505 W 44th St
What is being built at 1505 W 44th St?
The latest filing (City of Austin permit 2024-002566 EP, January 12, 2024) covers rebuilding oh electric service after a utility service regulation violation notice was left on house.
How many permits and filings does 1505 W 44th St have?
1 filing across 1 project, from January 12, 2024 to January 12, 2024.
Is there other construction near 1505 W 44th St?
Yes. Nearby filings include 4314 Rosedale Ave (gas line for generator, May 22, 2024); 4312 Rosedale Ave (tesla 2024 cybertruck awd with a charging location on the exterior wall of their home. the panel is 30 away and the conduit needs to be routed under the front porch, Nov 8, 2024); 4311 Ramsey Ave (the homeowner noticed a gas smell and called the gas company. the gas company found evidence of a leak and locked out the gas system. we replaced a black iron main line that had corroded due to house settling to repair leak. roughly 12 ft in gas piping was replaced, Dec 16, 2025).
How do I get alerts for new permits at 1505 W 44th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4314 Rosedale AveMay 22, 2024Gas line for generator · 34 m away
- 4312 Rosedale AveNov 8, 2024Tesla 2024 cybertruck awd with a charging location on the exterior wall of their home. the panel is 30 away and the conduit needs to be routed under the front porch · 37 m away
- 4311 Ramsey AveDec 16, 2025The homeowner noticed a gas smell and called the gas company. the gas company found evidence of a leak and locked out the gas system. we replaced a black iron main line that had corroded due to house settling to repair leak. roughly 12 ft in gas piping was replaced · 38 m away
- 4310 Rosedale AveMar 31, 2025Replacement of complete existing central heat and air system with or without duct work replace 3 ton vertical gas system (upstairs) · 43 m away
- 4402 Rosedale AveNov 4, 2026Express: fire repair damage · 56 m away
- 4312 Ramsey AveJul 15, 2026Replacement of complete existing central heat and air system with or without duct work remove and replace existing 2-ton vertical gas furnace/ac system with like-for-like equipment; no structural change · 66 m away
- 4306 Rosedale AveFeb 11, 2026Replacement of an existing water heater replace 40-gallon gas water heater location: interior closet · 68 m away
- 4306 Ramsey AveApr 21, 2026Gas yard line · 88 m away
- 4404 Ramsey AveNov 22, 2023***per coordination with 2023 149991 ex work may only occur 2/1/2024 - 2/8/2024*** ***per coordination with 23-140221 ex no work to occur 11/22/23-12/11/23*** construct new driveway approach of 12 ft and curb & gutter of 15 ft. *rs · 90 m away
- 4302 Rosedale AveApr 2, 2026Installation of 80amp car charger 4/7/26 sm - revised ** requires a 100 amp overcurrent protection device · 94 m away
- 4409 Ramsey AveNov 9, 2026Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 4300 Rosedale AveFeb 10, 2025Replacement of an existing water heater tankless gas · 109 m away