groundranger
Historic · latest filing Mar 2024Residential

2315 Northland Dr

Austin, TX 78756

2315 Northland Dr: 3 projects on record

City of Austin lists 3 filings across 3 projects at 2315 Northland Dr, Austin, TX 78756 since December 11, 2023. The most recent, filed March 4, 2024, covers: “Install new gas line from meter to generator”.

Compiled from City of Austin records · updated Mar 4, 2024

Projects
3
3 filings
Latest filing
Mar 4, 2024
since Dec 11, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new gas line from meter to generator

  1. AppliedMar 1, 2024
  2. IssuedMar 4, 2024
  3. WorkMar '24 – Mar '24
  4. Final inspectionMar 8, 2024

Passed final inspection Mar 8, 2024.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install new gas line from meter to generator

    Install new gas line from meter to generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of new 26kw permanent whole home generator (natural gas) connected to house meter and main panel. no meter can required. (benjamin levine)

    Installation of new 26kw permanent whole home generator (natural gas) connected to house meter and main panel. no meter can required. (benjamin levine)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Expedited review - *partial demolition* addition/remodel to existing 1-story single family residence to include 2nd story addition [6bed 4bath]

    Expedited review - *partial demolition* addition/remodel to existing 1-story single family residence to include 2nd story addition [6bed 4bath]

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2315 Northland Dr

What is being built at 2315 Northland Dr?

The latest filing (City of Austin permit 2024-026114 PP, March 4, 2024) covers install new gas line from meter to generator.

How many permits and filings does 2315 Northland Dr have?

3 filings across 3 projects, from December 11, 2023 to March 4, 2024.

Is there other construction near 2315 Northland Dr?

Yes. Nearby filings include 5700 Woodview Ave (new pool/spa for single family residence, Feb 28, 2025); 5611 Woodview Ave (replacement of complete existing central heat and air system with or without duct work, Jan 3, 2024); 5700 Shoalwood Ave (replacement of complete existing central heat and air system with or without duct work, Jul 16, 2024).

How do I get alerts for new permits at 2315 Northland Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78756
Email me when a new permit is filed