3902 Tonkawa Trl
Austin, TX 78756
3902 Tonkawa Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 3902 Tonkawa Trl, Austin, TX 78756. The most recent, filed September 17, 2025, covers: “Plumbing for unit a remodel per plans provided by morris hoover”.
Compiled from City of Austin records · updated Sep 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2025
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit withdrawnPlumbing for unit a remodel per plans provided by morris hoover
- AppliedDec 18, 2023
- IssuedSep 17, 2025
- !WorkSep '25 – Mar '26
- Final inspection
Marked withdrawn Sep 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectPlumbing for unit a remodel per plans provided by morris hoover
Plumbing for unit a remodel per plans provided by morris hoover
City of Austin permitPlumbing PermitWithdrawn- Record
- 2023-161128 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3902 Tonkawa Trl
What is being built at 3902 Tonkawa Trl?
The latest filing (City of Austin permit 2023-161128 PP, September 17, 2025) covers plumbing for unit a remodel per plans provided by morris hoover.
How many permits and filings does 3902 Tonkawa Trl have?
1 filing across 1 project, from September 17, 2025 to September 17, 2025.
Is there other construction near 3902 Tonkawa Trl?
Yes. Nearby filings include 3904 Tonkawa Trl (expedited review - *partial demolition* addition to existing 2-story duplex to include additional [1bed 1bath] in each unit replacement of roof exterior siding doors windows and kitchen millwork fixtures and appliances [total 6bed 5bath], Oct 29, 2024); 1403 W 39th Half St (addition/remodel. addition of a 2nd floor consisting of three bedrooms two bathrooms a play room fitness room and two screened porches. remove two walls of existing attached garage to create attached carport. comprehensive interior remodel. reconfigure interior layout of existing 1st floor resulting in a 4 bedroom 3.5 bathroom single family residence. remove unpermitted covered front porch/trellis. roll in scope of work from expired bp#: 2017-044428, Jul 20, 2026); 3905 Tonkawa Trl (pleasant grove addition block 2 portion of lots 3 & 4; resubdivision, Sep 18, 2012).
How do I get alerts for new permits at 3902 Tonkawa Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 3904 Tonkawa TrlOct 29, 2024Expedited review - *partial demolition* addition to existing 2-story duplex to include additional [1bed 1bath] in each unit replacement of roof exterior siding doors windows and kitchen millwork fixtures and appliances [total 6bed 5bath] · 23 m away
- 1403 W 39th Half StJul 20, 2026Addition/remodel. addition of a 2nd floor consisting of three bedrooms two bathrooms a play room fitness room and two screened porches. remove two walls of existing attached garage to create attached carport. comprehensive interior remodel. reconfigure interior layout of existing 1st floor resulting in a 4 bedroom 3.5 bathroom single family residence. remove unpermitted covered front porch/trellis. roll in scope of work from expired bp#: 2017-044428 · 46 m away
- 3905 Tonkawa TrlSep 18, 2012Pleasant grove addition block 2 portion of lots 3 & 4; resubdivision · 60 m away
- 3808 Tonkawa TrlNov 12, 202450 amp overhead temporary meter loop ref: 2024-068461 bp · 79 m away
- 3902 Bailey LnApr 26, 2024Replacement of an existing water heater · 91 m away
- 1306 W 39th Half StMay 28, 2026Replacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work replacement at 1306 w 39th 1/2 st. austin tx 78756 for michael donnell · 100 m away
- 3902 Peterson AveSep 16, 2025Repairing shorted out small outside panel · 105 m away
- 1412 W 39th Half StMay 4, 2026Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 3804 Bailey LnDec 19, 2024Interior remodel - replace all wood and tile flooring on the 1st floor with same. replace carpet on staircase with same. replace back door to patio with same. replace swinging door to powder room with pocket door. install shower in the storage closet in powder room replace countertop and backsplash in kitchen. replace ceiling in attached 3 car garage with r38 and new drywall. replace carpet all on th 2nd fl with wood. paint all walls ceilings and cabinets · 136 m away
- 1307 W 40th StMay 19, 2026Convert a portion of the existing screened porch into a new primary bathroom. the existing angled wall at the screened porch will be reconfigured to a 90-degree wall. the existing primary bathroom will be converted into closet space. additionally the existing guest bathroom will be remodeled · 138 m away
- 1305 W 40th StMay 10, 2024Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 3802 Tonkawa TrlMar 1, 2024Express: bathroom fixture replacement minor mep repairs · 139 m away