4200 Rosedale Ave

Austin, TX 78756

Water and sewer line work at 4200 Rosedale Ave

Two plumbing permits at 4200 Rosedale Ave cover replacing a cast-iron sewer line and a water line serving the home. The sewer permit was filed July 3, 2025, and the water line permit was filed November 18, 2025; both are marked final.

Summarized from City of Austin records · updated Nov 18, 2025

Projects
2
2 filings
Latest filing
Nov 18, 2025
since Jul 3, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Water line replacement from the meter to the home about 45 feet long

  1. AppliedNov 17, 2025
  2. IssuedNov 18, 2025
  3. WorkNov '25 – Nov '25
  4. Final inspectionNov 20, 2025

Passed final inspection Nov 20, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Water line replacement from the meter to the home about 45 feet long

    Water line replacement from the meter to the home about 45 feet long

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace cast iron sewer line from fence line to city tap with sch 40 pvc trench length approximately 15 feet

    Replace cast iron sewer line from fence line to city tap with sch 40 pvc trench length approximately 15 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4200 Rosedale Ave

What work was permitted at 4200 Rosedale Ave?

Austin permits show a cast-iron sewer line replacement and a water line replacement serving the home. Both permits are marked final.

When were the plumbing permits filed at 4200 Rosedale Ave?

The sewer line permit, 2025-081502 PP, was filed July 3, 2025. The water line permit, 2025-147217 PP, was filed November 18, 2025.

Is a new home being built at 4200 Rosedale Ave?

The records provided show plumbing permits for sewer and water line replacements, not a new-home construction permit.

What does permit 2025-081502 PP cover?

The July 3, 2025, permit covers replacing the cast-iron sewer line from the fence line to the city tap with Schedule 40 PVC. The listed trench length is about 15 feet.

What does permit 2025-147217 PP cover?

The November 18, 2025, permit covers replacing the water line from the meter to the home. The listed length is about 45 feet.

What plumbing work is happening near City Of Austin at 4301 Rosedale Ave?

At 4200 Rosedale Ave, permits cover a sewer line replacement and a water line replacement. The two permits were filed in July and November 2025 and are marked final.