4212 Ramsey Ave
Austin, TX 78756
EV charging circuit and water softener work at 4212 Ramsey Ave
City of Austin permits indicate electrical and plumbing work at the residence at 4212 Ramsey Ave, not a new building. An electrical permit filed August 25, 2025, covers a circuit for EV charging in the detached garage; a plumbing permit filed October 17, 2025, covers a non-pre-plumbed water softener installation. Both permits are marked final.
Summarized from City of Austin records · updated Oct 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 17, 2025
- since Aug 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNot pre-plumbed water softener install
- AppliedOct 14, 2025
- IssuedOct 17, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 23, 2025
Passed final inspection Oct 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNot pre-plumbed water softener install
Not pre-plumbed water softener install
City of Austin permitPlumbing PermitFinal- Record
- 2025-132934 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing circuit for ev charging inside of detached garage
Installing circuit for ev charging inside of detached garage
City of Austin permitElectrical PermitFinal- Record
- 2025-105524 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4212 Ramsey Ave
What work is happening at 4212 Ramsey Ave?
City of Austin permits describe a circuit for EV charging in the detached garage and installation of a water softener. Both permits are marked final.
Is a new building being built at 4212 Ramsey Ave?
The records provided show electrical and plumbing permits for the residence, not a permit for a new building.
Was an EV charger permitted at 4212 Ramsey Ave?
An electrical permit filed August 25, 2025, covers installation of a circuit for EV charging inside the detached garage. The permit number is 2025-105524 EP.
When was the EV charging circuit permitted at 4212 Ramsey Ave?
The City of Austin filed electrical permit 2025-105524 EP on August 25, 2025. It is marked final.
Was a water softener installation permitted at 4212 Ramsey Ave?
Yes. Plumbing permit 2025-132934 PP, filed October 17, 2025, describes a non-pre-plumbed water softener installation. It is marked final.
When was the water softener permit filed for 4212 Ramsey Ave?
The City of Austin filed plumbing permit 2025-132934 PP on October 17, 2025. The permit is marked final.
Also being built nearby
All of 78756- 4213 Ramsey AveMay 14, 2024Express foundation repair · 44 m away
- 4206 Ramsey AveJun 4, 2024Replacement of an existing water heater like for like · 45 m away
- 4211 Ramsey AveFeb 19, 2024Upgrading 200 amp service · 48 m away
- 4211 Sinclair AveMar 16, 2026Sewer line replacement from the home to the city tap. total length of sewer line is 60 feet · 55 m away
- 4204 Ramsey AveNov 11, 2026We will install a new 3-inch expansion sleeve on the existing underground electrical feeder conduit entering the bottom of the meter enclosure. the existing conduit has settled and pulled away from the meter leaving electrical conductors exposed and at risk of rubbing against the metal enclosure which could result in damage to the wiring. we will coordinate with austin energy to have the electrical service temporarily disconnected and the meter removed so the necessary repairs can be completed safely · 61 m away
- 4209 Sinclair AveSep 17, 2026Base: installing a backup battery system and additional meter socket · 62 m away
- 4207 Ramsey AveMar 15, 2024We will be tunneling underneath the home to replace 20 of cast iron sewer line · 63 m away
- 4207 Sinclair AveOct 22, 2025New wood deck - replacement of existing deck in its entirety (493.41 sq ft). new deck will be larger (593 sq ft). will have opening for existing tree · 73 m away
- 4205 Ramsey AveNov 6, 2026Renovate existing 1-story adu: replace windows doors siding & roofing. update mep. reconfigure floor plan/plumbing locations. replace foundation in exact same footprint as existing · 73 m away
- 4306 Ramsey AveApr 21, 2026Gas yard line · 90 m away
- 1606 W 42nd StJan 27, 2026Construct new sidewalk of 10.5 lf with 2 new walkways connecting from curb to residence · 93 m away
- 4212 Rosedale AveAug 7, 2026Run 60 amp circuit for ev wall connector in garage · 97 m away