4215 Shoalwood Ave
Austin, TX 78756
4215 Shoalwood Ave: 3 projects on record
City of Austin lists 3 filings across 3 projects at 4215 Shoalwood Ave, Austin, TX 78756 since July 15, 2025. The most recent, filed August 7, 2025, covers: “Construct new 2nd driveway approach of 18 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st”.
Compiled from City of Austin records · updated Aug 7, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 7, 2025
- since Jul 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new 2nd driveway approach of 18 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st
- AppliedJan 28, 2021
- IssuedAug 7, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 8, 2025
Passed final inspection Aug 8, 2025.
Permit & project history
3 projectsConstruct new 2nd driveway approach of 18 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st
Construct new 2nd driveway approach of 18 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st
City of Austin permitDriveway / SidewalksFinal- Record
- 2025-083710 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st
City of Austin permitDriveway / SidewalksFinal- Record
- 2021-068424 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Building #2 new 2 story secondary dwelling 2/2
Building #2 new 2 story secondary dwelling 2/2
City of Austin permitMechanical PermitFinal- Record
- 2021-068424 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4215 Shoalwood Ave
What is being built at 4215 Shoalwood Ave?
The latest filing (City of Austin permit 2025-083710 DS, August 7, 2025) covers construct new 2nd driveway approach of 18 ft. no sidewalk inspection per plan review. driveway approach on w 43rd st.
How many permits and filings does 4215 Shoalwood Ave have?
3 filings across 3 projects, from July 15, 2025 to August 7, 2025.
Is there other construction near 4215 Shoalwood Ave?
Yes. Nearby filings include 4213 Shoalwood Ave (express: foundation repair, Mar 17, 2026); 4214 Shoalwood Ave (replace the sewer yard line with sch 40 pvc, Apr 15, 2026); 4303 Shoalwood Ave (replacement of a 50 gallon gas water heater, Mar 14, 2025).
How do I get alerts for new permits at 4215 Shoalwood Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4213 Shoalwood AveMar 17, 2026Express: foundation repair · 15 m away
- 4214 Shoalwood AveApr 15, 2026Replace the sewer yard line with sch 40 pvc · 42 m away
- 4303 Shoalwood AveMar 14, 2025Replacement of a 50 gallon gas water heater · 48 m away
- 4212 Sinclair AveMar 11, 2026Replace sewer yard line from house connection to city tap · 55 m away
- 4300 Sinclair AveMar 11, 2026Replace sewer yard line from house connection to city tap · 61 m away
- 4302 Shoalwood AveSep 16, 2025Yard sewer line replacement 25ft & water heater replacement water yard line replacement also · 63 m away
- 4304 Shoalwood AveJul 7, 2025Construct new driveway approach of 14.25 ft. no sidewalk inspection per plan review · 77 m away
- 4204 Shoalwood AveAug 10, 2026Adding 3 circuits for 4 ceiling fans 8 flood lights 6 switches and led lights on a stairwell · 88 m away
- 4203 Shoalwood AveJun 9, 2026Replacement of complete duct system only like for like: 3 ton horizontal 90% gas · 92 m away
- 4204 Sinclair AveAug 7, 202640gal gas tank located in the attic replacement prv · 93 m away
- 4221 Shoal Creek BlvdMar 18, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 4225 Shoal Creek BlvdOct 24, 2025Replacement of complete existing central heat and air system with or without duct work · 95 m away