4308 Marathon Blvd
Austin, TX 78756
4308 Marathon Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 4308 Marathon Blvd, Austin, TX 78756. The most recent, filed January 23, 2024, covers: “Abandon leaking water line and reroute it in attic”.
Compiled from City of Austin records · updated Jan 23, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 23, 2024
- since Jan 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAbandon leaking water line and reroute it in attic
- AppliedJan 18, 2024
- IssuedJan 23, 2024
- WorkJan '24 – Jan '24
- Final inspectionJan 24, 2024
Passed final inspection Jan 24, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectAbandon leaking water line and reroute it in attic
Abandon leaking water line and reroute it in attic
City of Austin permitPlumbing PermitFinal- Record
- 2024-006737 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4308 Marathon Blvd
What is being built at 4308 Marathon Blvd?
The latest filing (City of Austin permit 2024-006737 PP, January 23, 2024) covers abandon leaking water line and reroute it in attic.
How many permits and filings does 4308 Marathon Blvd have?
1 filing across 1 project, from January 23, 2024 to January 23, 2024.
Is there other construction near 4308 Marathon Blvd?
Yes. Nearby filings include 4310 Marathon Blvd (replacement of complete existing central heat and air system with or without duct work, Sep 18, 2024); 4304 Marathon Blvd (replacement of complete existing central heat and air system with or without duct work, Oct 2, 2026); 4309 Marathon Blvd (we are blood, Aug 31, 2026).
How do I get alerts for new permits at 4308 Marathon Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4310 Marathon BlvdSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 15 m away
- 4304 Marathon BlvdOct 2, 2026Replacement of complete existing central heat and air system with or without duct work · 31 m away
- 4309 Marathon BlvdAug 31, 2026We are blood · 46 m away
- 4309 Bellvue AveDec 19, 2023Construct new driveway approach of 10 ft. driveway approach is from the alley. no sidewalk inspection per plan review.*shay inspections to occur concurrently with second driveway permitted 21-128922 ds · 54 m away
- 4311 Bellvue AveOct 13, 2026New construction accessory use in-ground pool · 58 m away
- 1102 W 43rd StMay 1, 2025Express - tub-shower conversion replace 1 window at bathroom · 63 m away
- 4305 Bellvue AveDec 18, 2024New irrigation system · 64 m away
- 4315 Marathon BlvdSep 18, 2024Corner lot; construct a new walkway of 4 lf connecting from sidewalk to residence and new driveway approach of 16 ft · 64 m away
- 4303 Marathon BlvdApr 30, 2024Cap off water and waste water · 64 m away
- 4301 Bellvue AveJun 1, 2026New construction of 2-story secondary unit with 2 new driveways · 84 m away
- 1004 W 43rd StOct 29, 2026Eplan: residential expedited review - small lot single-family residential use (sq ft-3) new construction of a 2-story single family res. [3bed 3bath] with covered porch and attached carport · 86 m away
- 4402 Marathon BlvdJan 8, 2024Addition/remodel. comprehensive remodel of existing 2-story noncomplying single family residence. addition of an enlarged covered porch with balcony to front of residence. addition of a mudroom half bathroom stairwell enlarged laundry room covered porch and screened porch to side and rear of residence. addition of a 2nd floor partially covered balcony. reconfigure interior layout resulting in a 4 bedroom 5.5 bathroom single family residence · 92 m away