HVAC system replacement permitted at 4708 Ramsey Ave
A replacement of the existing central heating and air system was permitted at 4708 Ramsey Ave on January 9, 2026. The City of Austin permit describes a complete system replacement, with or without duct work. Earlier permits in 2023 covered replacement of an existing water heater.
Summarized from City of Austin records · updated Jan 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 9, 2026
- since Jan 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJan 8, 2026
- IssuedJan 9, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 9, 2026
Passed final inspection Feb 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-002475 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-078121 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitWithdrawn- Record
- 2023-074080 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4708 Ramsey Ave
What is being built at 4708 Ramsey Ave?
The listed permits are for replacing the existing central heating and air system and an existing water heater, not for a new building. The latest permit, 2026-002475 MP, was issued January 9, 2026.
Is a new HVAC system being installed at 4708 Ramsey Ave?
Yes. City of Austin permit 2026-002475 MP describes replacement of the complete existing central heat and air system, with or without duct work. It was filed January 9, 2026, and has final status.
When was the HVAC replacement permitted at 4708 Ramsey Ave?
The City of Austin record is dated January 9, 2026. The permit number is 2026-002475 MP.
Was a water heater replacement permitted at 4708 Ramsey Ave?
A permit dated July 6, 2023, lists replacement of an existing water heater. Permit 2023-078121 PP has final status.
Was there another water heater permit for 4708 Ramsey Ave?
Yes. Permit 2023-074080 PP, dated June 15, 2023, also described replacement of an existing water heater, but its status is withdrawn.
Also being built nearby
All of 78756- 4710 Ramsey AveAug 15, 2025Express: handicap ramp · 14 m away
- 4709 Sinclair AveAug 11, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out: 2 ton horizontal gas system (upstairs) · 55 m away
- 4705 Sinclair AveSep 12, 2025Express: remove and replace 1 window like for like · 63 m away
- 4703 Sinclair AveJul 16, 2025Service mast was damaged for a 2nd time by large tree branch. relocating main disconnect and mast to rear building to avoid future damage. will reseed dwelling with underground conduit · 72 m away
- 4804 Ramsey AveDec 5, 2024Replacement of an existing water heater wh in interior closet of apartment behind main house · 78 m away
- 4710 Sinclair AveJun 27, 2025Replacement of complete existing central heat and air system with or without duct work replace exisitng hvac system · 99 m away
- 4805 Sinclair AveSep 29, 2026Base: installing a backup battery system and additional meter socket · 100 m away
- 4807 Sinclair AveNov 5, 2026New pool and spa (with plumbing permit) · 112 m away
- 4614 Ramsey AveSep 22, 2026Base: installing a backup battery system and additional meter socket · 122 m away
- 4615 Ramsey AveJul 6, 2026Excavate and replace main sewer line · 129 m away
- 4804 Sinclair AveMay 28, 2026New 1-story accessory structure consisting of a half bathroom and partially covered wood deck with outdoor kitchen · 132 m away
- 4618 Rosedale AveNov 10, 2025Install a new dedicated line between furnace and oven gas line · 138 m away