5707 Mc Carthy Cir
Austin, TX 78756
Drain system replacement at 5707 Mc Carthy Cir
A City of Austin plumbing permit covers tunneling beneath the foundation at 5707 Mc Carthy Cir to replace the drain system. The permit was filed December 31, 2025, and describes two access holes at the front and right sides.
Summarized from City of Austin records · updated Dec 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 31, 2025
- since Dec 31, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled10 tunnel below the foundation to gain access to below pier and beam foundation and replace entire drain system. 2 access holes - front and right
- AppliedNov 21, 2025
- IssuedDec 31, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 27, 2026
Passed final inspection Jan 27, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project10 tunnel below the foundation to gain access to below pier and beam foundation and replace entire drain system. 2 access holes - front and right
10 tunnel below the foundation to gain access to below pier and beam foundation and replace entire drain system. 2 access holes - front and right
City of Austin permitPlumbing PermitFinal- Record
- 2025-150067 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5707 Mc Carthy Cir
What is being built at 5707 Mc Carthy Cir?
The permit describes plumbing work, not a new building: tunneling beneath the foundation to replace the drain system. It was filed December 31, 2025.
What work does the permit cover at 5707 Mc Carthy Cir?
Permit 2025-150067 PP covers tunneling below the foundation to access the area beneath the pier-and-beam foundation and replace the entire drain system. It also lists two access holes, at the front and right.
When was the plumbing permit filed for 5707 Mc Carthy Cir?
The City of Austin permit was filed December 31, 2025. Its status is listed as Final.
Is a new home being built at 5707 Mc Carthy Cir?
The available permit record does not indicate new home construction. It describes tunneling beneath the foundation for drain system replacement.
What's being worked on near Roereal on West Koenig Lane?
At 5707 Mc Carthy Cir, about 105 meters from Roereal at 1525 W Koenig Ln, a plumbing permit covers tunneling under the foundation and replacing the drain system.
What is permit 2025-150067 PP for in Austin?
It is a City of Austin plumbing permit for tunneling beneath the foundation and replacing the entire drain system at 5707 Mc Carthy Cir. The filing date is December 31, 2025.
Also being built nearby
All of 78756- 5704 Mc Carthy CirAug 16, 2024Tunnnel under slab to replace all cast iron drains with pvc · 46 m away
- 5702 Mc Carthy CirSep 24, 20185702 mccarthy cir · 62 m away
- 5711 William Holland AveSep 2, 2026Total demolition of 1571 sq ft sfr circa 1950 · 63 m away
- 5701 Mc Carthy CirAug 13, 2025We will be installing a ev charger · 64 m away
- 1616 Ullrich AveJul 2, 2026Interior remodel- removing a window and replacing with wall · 87 m away
- 5706 Jim Hogg AveNov 13, 2025Replacement of an existing water heater mike kubic water heater replacement · 98 m away
- 5710 William Holland AveDec 13, 2024Expedited review: addition and remodel to existing 1-story single family res [3bed 2.5bath]. work to include demolition deck create additional dining space front porch and remodel shed · 104 m away
- 1525 W Koenig Ln · Roereal LLCOct 21, 2026Koenig white box - austin — renovation/alteration — conversion of existing office back to white box office (with co) 1,456 +/- sq ft · 105 m away
- 1518 Koenig LnMar 2, 2007Plaques plus, inc · 114 m away
- 5703 William Holland AveJun 13, 2024Installing a new irrigation system · 135 m away
- 1701 W Koenig LnNov 6, 2025Swap old federal pacific panel the new meter loop · 138 m away
- 1702 Ullrich AveJun 11, 2025Replacement of complete existing central heat and air system with or without duct work replacement of hvac equipment and ductwork · 139 m away