Central heat and air replacement permitted at 1011 Taulbee Ln
A City of Austin mechanical permit indicates replacement of the existing central heat and air system at 1011 Taulbee Ln, with or without ductwork. The active permit, 2026-080794 MP, was filed on June 29, 2026.
Summarized from City of Austin records · updated Jun 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 29, 2026
- since Jun 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 24, 2026
- IssuedJun 29, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-080794 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1011 Taulbee Ln
What is being done at 1011 Taulbee Ln?
A City of Austin mechanical permit indicates replacement of the existing central heat and air system, with or without ductwork.
Was an HVAC permit filed for 1011 Taulbee Ln?
Yes. Permit 2026-080794 MP was filed on June 29, 2026, and is listed as active.
When was the central heat and air replacement permitted at 1011 Taulbee Ln?
The City of Austin permit was filed on June 29, 2026.
Is a new building being built at 1011 Taulbee Ln?
The available record is for a mechanical permit to replace an existing central heat and air system. It does not describe construction of a new building.
Does the work at 1011 Taulbee Ln include ductwork?
The permit description says the existing central heat and air system will be replaced with or without ductwork; it does not specify which.
Also being built nearby
All of 78757- 7615 Watson StFeb 20, 2024New irrigation system installation · 19 m away
- 1007 Taulbee LnJan 2, 2025Installation of a lvl 2 electrical vehicle charger · 59 m away
- 7614 Watson StJun 6, 2024Upgrade main electrical services · 61 m away
- 1100 Taulbee LnMay 6, 2014Blazek subdivision · 78 m away
- 7608 Watson StMar 16, 2009North gate addition, block g, resub of lots 1 & 2 — north gate addition, block g, resub of lots 1 & 2 · 79 m away
- 1001 Taulbee LnDec 17, 2024Replacing sewer line from home to city tap · 86 m away
- 7602 Watson StJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 1000 Taulbee LnJan 6, 2015Lot 38 north gate half acres: resubdivision of · 89 m away
- 7707 Watson StOct 28, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4bath] with office covered porch covered patio and attached garage · 91 m away
- 7706 Watson StFeb 22, 2024Total demolition of an sfr circa 1947 approx 1534 sq ft · 100 m away
- 1107 Taulbee LnJan 5, 2024Installation of a level 2 ev charger. wire run will be from the outside panel along side the wall to charger location outside the garage · 106 m away
- 1004 Morrow StNov 3, 2025(chalikonda sri) - installation of circuit for elec. vehicle charging station - esip · 107 m away