1210 Piedmont Ave
Austin, TX 78757
1210 Piedmont Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1210 Piedmont Ave, Austin, TX 78757. The most recent, filed September 16, 2024, covers: “Service rebuild”.
Compiled from City of Austin records · updated Sep 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2024
- since Sep 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledService rebuild
- AppliedSep 10, 2024
- IssuedSep 16, 2024
- WorkSep '24 – Apr '25
- Final inspectionApr 3, 2025
Passed final inspection Apr 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectService rebuild
Service rebuild
City of Austin permitElectrical PermitFinal- Record
- 2024-122822 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1210 Piedmont Ave
What is being built at 1210 Piedmont Ave?
The latest filing (City of Austin permit 2024-122822 EP, September 16, 2024) covers service rebuild.
How many permits and filings does 1210 Piedmont Ave have?
1 filing across 1 project, from September 16, 2024 to September 16, 2024.
Is there other construction near 1210 Piedmont Ave?
Yes. Nearby filings include 1209 Piedmont Ave (express: foundation repair, Jul 2, 2026); 1216 Piedmont Ave (expose and replace up to 50 of main building sewer line. trench will be going through asphalt, Nov 24, 2025); 1213 Piedmont Ave (total demolition of detached garage. 1 story 240 sq ft circa 1949. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, May 1, 2024).
How do I get alerts for new permits at 1210 Piedmont Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1209 Piedmont AveJul 2, 2026Express: foundation repair · 44 m away
- 1216 Piedmont AveNov 24, 2025Expose and replace up to 50 of main building sewer line. trench will be going through asphalt · 46 m away
- 1213 Piedmont AveMay 1, 2024Total demolition of detached garage. 1 story 240 sq ft circa 1949. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 47 m away
- 1211 Madison AveJul 11, 2025Install an irrigation system to permit address · 54 m away
- 1300 Piedmont AveJul 17, 2026Install level 2 ev charger · 60 m away
- 1205 Piedmont AveMay 1, 2025Express: replace siding by the front back right and left side of the house · 62 m away
- 1203 Madison AveDec 18, 2024Express: insulation/drywall repair electrical repair · 79 m away
- 1301 Piedmont AveNov 16, 2026Homebuilder loop for new construction of sfr ref: 2026-108948 bp · 79 m away
- 1201 Piedmont AveFeb 15, 2024Install 2 customer supplied level 2 ev chargers · 85 m away
- 1304 Piedmont AveJul 8, 2024Wire new 200 square foot shed · 92 m away
- 1303 Piedmont AveApr 30, 2024We are adding a circuit for a hot tub and a sub panel for a sauna and a cold plunge pool. per conversation with homeowner (john curtis) these are all above ground non permanent structures. john curtis · 93 m away
- 1206 Madison AveOct 27, 2025Replace water sewer under the house and sewer yard line · 98 m away