1309 Dwyce Dr
Austin, TX 78757
HVAC, water-line and water-heater replacements at 1309 Dwyce Dr
Permits indicate replacement of the existing central heating and air system at this Austin home, filed March 24, 2025. A plumbing permit filed March 19, 2026, covers replacement of interior hot and cold water lines and the water heater.
Summarized from City of Austin records · updated Mar 19, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 19, 2026
- since Mar 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace interior hot and cold water lines with uponor pex pipe. water heater replacement
- AppliedMar 17, 2026
- IssuedMar 19, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 20, 2026
Passed final inspection Mar 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace interior hot and cold water lines with uponor pex pipe. water heater replacement
Replace interior hot and cold water lines with uponor pex pipe. water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2026-032161 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-033754 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1309 Dwyce Dr
What work is being done at 1309 Dwyce Dr?
City of Austin permits indicate replacement of the home's central heating and air system, interior water lines and water heater.
Is a new home being built at 1309 Dwyce Dr?
The records show permits for replacement work at a residence, not a new home construction project.
When was the HVAC replacement permitted at 1309 Dwyce Dr?
The mechanical permit was filed March 24, 2025. Permit 2025-033754 MP covers replacement of the existing central heat and air system, with or without duct work.
What plumbing work is permitted at 1309 Dwyce Dr?
Permit 2026-032161 PP covers replacement of interior hot and cold water lines with Uponor PEX pipe and replacement of the water heater. It was filed March 19, 2026.
Are the permits for 1309 Dwyce Dr final?
Both City of Austin permits are listed with Final status: the mechanical permit filed March 24, 2025, and the plumbing permit filed March 19, 2026.
Also being built nearby
All of 78757- 1307 Dwyce DrSep 2, 2025Garage conversion conversion of carport into new primary bedroom with ensuite bathroom · 18 m away
- 1305 Dwyce DrDec 6, 2023New inground swimming pool and concrete deck with reqd enclosure device for existing 1-story sfr · 38 m away
- 1308 Dwyce DrSep 21, 2026Installation of ev charger. running a 240volt 50amp circuit from main panel to ev receptacle in the garage · 40 m away
- 1306 Dwyce DrOct 16, 2026Service upgrade to 200amp · 45 m away
- 1306 Choquette DrMay 22, 2025Install a full lawn sprinkler system · 45 m away
- 1310 Dwyce DrJul 20, 2026Excavate 35 tunnel to repair main drain line under the house · 47 m away
- 1312 Choquette DrFeb 1, 2024Construction tpole reference 2020-174292 bp · 60 m away
- 1312 Dwyce DrDec 31, 2024Removal and reinstallation of 17 solar panels for roof remodel · 62 m away
- 6800 Woodrow AveMay 31, 2024Woodrow studios · 78 m away
- 1307 Choquette DrApr 14, 2026Replacement of an existing water heater · 84 m away
- 1401 Dwyce DrMay 29, 2024New construction in-ground pool · 88 m away
- 1305 Choquette DrOct 24, 2025Install new 4.675 kw rooftop solar system for existing residential only · 91 m away