1408 Justin Ln
Austin, TX 78757
Tankless water heater replacement permitted on Justin Lane
A City of Austin plumbing permit indicates work to replace an existing water heater with a tankless unit at 1408 Justin Ln. The permit was filed on November 21, 2025, and is marked final.
Summarized from City of Austin records · updated Nov 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2025
- since Nov 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater tankless
- AppliedNov 17, 2025
- IssuedNov 21, 2025
- WorkNov '25 – Jan '26
- Final inspectionJan 16, 2026
Passed final inspection Jan 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater tankless
Replacement of an existing water heater tankless
City of Austin permitPlumbing PermitFinal- Record
- 2025-147808 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1408 Justin Ln
What work is happening at 1408 Justin Ln?
A City of Austin plumbing permit indicates replacement of an existing water heater with a tankless unit. The permit, 2025-147808 PP, was filed November 21, 2025.
Is a new home being built at 1408 Justin Ln?
The record for 1408 Justin Ln is for water heater replacement, not new-home construction. It is a plumbing permit marked final.
When was the water heater permit filed at 1408 Justin Ln?
The City of Austin filed plumbing permit 2025-147808 PP on November 21, 2025.
What type of permit was issued for 1408 Justin Ln?
The City of Austin issued a plumbing permit for replacement of an existing water heater with a tankless unit. The record is marked final.
Is the 1408 Justin Ln permit final?
Yes. The City of Austin permit record lists the water heater replacement permit as final.
Also being built nearby
All of 78757- 1404 Justin LnFeb 9, 2026Home: new construction of 2 story detached dwelling unit 3 bed 2.5 bath with attached garage · 38 m away
- 1402 Justin LnJan 17, 2025Install gas line to generator · 55 m away
- 1409 Cullen AveOct 19, 2026Base: installing a backup battery system and additional meter socket · 64 m away
- 1415 Justin LnJan 19, 2024Replacement of a mini split ductless system · 70 m away
- 1403 Justin LnDec 16, 2025Rooftop solar with self consumption battery installation · 73 m away
- 1405 Cullen AveNov 5, 2026Installation of a dedicated gas line for a standby generator · 75 m away
- 1417 Justin LnMay 21, 20201417 justin lane subdivision · 87 m away
- 1401 Cullen AveFeb 19, 2026Replacement of an existing water heater · 97 m away
- 1410 Dwyce DrJun 16, 2025**reference 2024 147488 bp** temp power and pole · 99 m away
- 1406 Dwyce DrJul 23, 2025Judge - install new 7.30kw rooftop solar system to existing residential only using line side tap · 100 m away
- 1406 Cullen AveJul 22, 2024Installation of solar battery only · 109 m away
- 1402 Dwyce DrOct 28, 2026Addition of a primary bedroom and bathroom. new uncovered wood deck. reconfigure existing utility room · 112 m away