1501 Beckett St
Austin, TX 78757
Electrical and HVAC work permitted at 1501 Beckett St
Permits at 1501 Beckett St cover replacement of the existing central heating and air system and a 125-amp overhead electrical service rebuild. The mechanical permit was filed June 6, 2024, and the electrical permit was filed July 20, 2026; both are listed as final.
Summarized from City of Austin records · updated Jul 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 20, 2026
- since Jun 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled125-amp overhead service rebuild
- AppliedJul 16, 2026
- IssuedJul 20, 2026
- WorkJul '26 – Sep '26
- Final inspectionSep 8, 2026
Passed final inspection Sep 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projects125-amp overhead service rebuild
125-amp overhead service rebuild
City of Austin permitElectrical PermitFinal- Record
- 2026-091680 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-070528 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1501 Beckett St
What work is permitted at 1501 Beckett St in Austin?
City of Austin permits cover replacement of the existing central heat and air system and a 125-amp overhead electrical service rebuild. Both permits are listed as final.
Is a new home being built at 1501 Beckett St?
The listed permits describe work on an existing heating and air system and an overhead electrical service, not construction of a new home.
When was the HVAC permit filed at 1501 Beckett St?
The City of Austin mechanical permit, 2024-070528 MP, was filed June 6, 2024. It covers replacement of the existing central heat and air system.
What is the electrical permit for at 1501 Beckett St?
Electrical permit 2026-091680 EP covers a 125-amp overhead service rebuild. It was filed July 20, 2026, and is listed as final.
Are the permits for 1501 Beckett St final?
Yes. The City of Austin lists both the 2024 mechanical permit and the 2026 electrical permit as final.
Also being built nearby
All of 78757- 1507 Beckett StApr 6, 202645 tunnel below the foundation to replace entire drain system. 1 access hole on left · 62 m away
- 8201 Polar DrMar 25, 2026Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 1412 Beckett StJun 20, 2024Partial sewer drain repair under home laundry and kitchen only (tunnel) · 66 m away
- 1502 Wooten DrMay 13, 2026200amp panel change · 76 m away
- 1412 Wooten DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 8203 Polar DrMar 10, 202540 trench to replace the yard sewer line · 78 m away
- 1410 Beckett StJan 6, 2026Replace 2 - 40 gal gas water heaters · 81 m away
- 1509 Beckett StJul 4, 2025New irrigation installation on landscape areas · 83 m away
- 8204 Kromer StJun 11, 2025Install new 6.375 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 85 m away
- 1410 Wooten DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 1417 Kamar DrMar 13, 2026Replace kitchen branch line approximately 50 feet under slab in tunnel · 99 m away
- 8205 Polar DrApr 19, 2024Express - replace 3 existing windows & existing doors (same size and location) 460 sq ft of siding sheetrock repairs and interior painting · 99 m away