1508 Cullen Ave
Austin, TX 78757
1508 Cullen Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1508 Cullen Ave, Austin, TX 78757. The most recent, filed June 6, 2024, covers: “Ev install”.
Compiled from City of Austin records · updated Jun 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2024
- since Jun 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedJun 5, 2024
- IssuedJun 6, 2024
- WorkJun '24 – Dec '24
- Final inspectionJun 20, 2024
Passed final inspection Jun 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2024-070916 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1508 Cullen Ave
What is being built at 1508 Cullen Ave?
The latest filing (City of Austin permit 2024-070916 EP, June 6, 2024) covers ev install.
How many permits and filings does 1508 Cullen Ave have?
1 filing across 1 project, from June 6, 2024 to June 6, 2024.
Is there other construction near 1508 Cullen Ave?
Yes. Nearby filings include 1506 Cullen Ave (install irrigation system, Feb 4, 2026); 1513 Cullen Ave (dig up and replace approximately 30 of waterline from the water meter to the front of the home only to tie into the existing pex waterline underneath the home, Nov 18, 2025); 1505 Cullen Ave (replacement of complete existing central heat and air system with or without duct work like for like: 1.5 ton mini-split system (back studio), Oct 2, 2025).
How do I get alerts for new permits at 1508 Cullen Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1506 Cullen AveFeb 4, 2026Install irrigation system · 19 m away
- 1513 Cullen AveNov 18, 2025Dig up and replace approximately 30 of waterline from the water meter to the front of the home only to tie into the existing pex waterline underneath the home · 58 m away
- 1505 Cullen AveOct 2, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 1.5 ton mini-split system (back studio) · 59 m away
- 1513 W St Johns AveAug 4, 2026Upgrade main electrical service to 350 amp change both meter bases change both panels · 60 m away
- 1518 W St Johns AveJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 1704 Cullen AveJan 9, 2024Construct new driveway approach of 19 ft. no sidewalk inspection per plan review. *shay · 107 m away
- 1502 Justin LnOct 21, 2026Express: installing 9 sonotube piers and 78 of 4x6 beam · 109 m away
- 1506 Justin LnAug 1, 2024Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 1500 Justin LnSep 17, 2024Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 1508 W St Johns AveJun 16, 2025(izzo chris) - installation of circuit for elec. vehicle charging station - esip · 117 m away
- 1705 Cullen AveOct 7, 2025Eplan: residential expedited review - new autofill pool · 120 m away
- 1506 W St Johns AveJul 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 124 m away