groundranger
Active · latest filing Nov 2026Residential

1715 Dartmouth Ave

Austin, TX 78757

Backup battery system permitted at 1715 Dartmouth Ave

An active City of Austin electrical permit filed November 4, 2026, covers installation of a backup battery system and an additional meter socket at 1715 Dartmouth Ave. A separate permit for a Level 2 EV charger was filed in 2024 and is final.

Summarized from City of Austin records · updated Nov 4, 2026

Projects
2
2 filings
Latest filing
Nov 4, 2026
since Oct 22, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedOct 23, 2026
  2. IssuedNov 4, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
8% through of the permit windowNov 4, 2026 → May 3, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <60 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <60 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1715 Dartmouth Ave

What is being installed at 1715 Dartmouth Ave?

A City of Austin permit indicates installation of a backup battery system and an additional meter socket. The active permit is 2026-140202 EP, filed November 4, 2026.

Is a new building being built at 1715 Dartmouth Ave?

The records provided show electrical permits, not a permit for new construction. The latest permit covers a backup battery system and an additional meter socket.

When was the backup battery permit filed at 1715 Dartmouth Ave?

The City of Austin filed permit 2026-140202 EP on November 4, 2026. Its status is listed as active.

Is there an EV charger at 1715 Dartmouth Ave?

A City of Austin permit filed October 22, 2024, covers a Level 2 EV charger powered by a 60-amp circuit. Permit 2024-139311 EP is listed as final.

What permits have been filed for 1715 Dartmouth Ave?

The records show two City of Austin electrical permits: 2024-139311 EP for a Level 2 EV charger, filed October 22, 2024, and 2026-140202 EP for a backup battery system and additional meter socket, filed November 4, 2026.

Also being built nearby

All of 78757
Email me when it passes final inspection