1715 W St Johns Ave
Austin, TX 78757
1715 W St Johns Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1715 W St Johns Ave, Austin, TX 78757. The most recent, filed January 22, 2025, covers: “Tunnel roughly 35 under the foundation of the home and replace all cast iron piping with sch40 pvc pipe”.
Compiled from City of Austin records · updated Jan 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 22, 2025
- since Jan 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel roughly 35 under the foundation of the home and replace all cast iron piping with sch40 pvc pipe
- AppliedJan 15, 2025
- IssuedJan 22, 2025
- WorkJan '25 – Jul '25
- Final inspectionJul 1, 2025
Passed final inspection Jul 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel roughly 35 under the foundation of the home and replace all cast iron piping with sch40 pvc pipe
Tunnel roughly 35 under the foundation of the home and replace all cast iron piping with sch40 pvc pipe
City of Austin permitPlumbing PermitFinal- Record
- 2025-005372 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1715 W St Johns Ave
What is being built at 1715 W St Johns Ave?
The latest filing (City of Austin permit 2025-005372 PP, January 22, 2025) covers tunnel roughly 35 under the foundation of the home and replace all cast iron piping with sch40 pvc pipe.
How many permits and filings does 1715 W St Johns Ave have?
1 filing across 1 project, from January 22, 2025 to January 22, 2025.
Is there other construction near 1715 W St Johns Ave?
Yes. Nearby filings include 1711 W St Johns Ave (construct 2 new driveway approach of 12 ft (each) and curb & gutter of 10 ft, Apr 15, 2025); 1714 W St Johns Ave (new irrigation, Apr 30, 2025); 1712 Cullen Ave (replacement of complete existing central heat and air system with or without duct work, Sep 15, 2026).
How do I get alerts for new permits at 1715 W St Johns Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1711 W St Johns AveApr 15, 2025Construct 2 new driveway approach of 12 ft (each) and curb & gutter of 10 ft · 38 m away
- 1714 W St Johns AveApr 30, 2025New irrigation · 43 m away
- 1712 Cullen AveSep 15, 2026Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 1710 Cullen AveDec 2, 2024Express: project includes remodel of master bathroom following discovery of a water leak in the shower. work involves repair of drywall in bathroom and adjacent kitchen flooring in kitchen bath and bedroom. work also involves complete replacement of bathroom shower walls with schluter system tile for shower walls flooring fixtures and cabinets · 72 m away
- 1708 Cullen AveMar 7, 2026Install range circuit breaker and receptacle with required material and equipment · 81 m away
- 7012 Yates AveSep 28, 2026Construct new driveway approach of 12 ft · 90 m away
- 1800 Cullen AveJun 17, 2026Install new 20kw energy storage system for existing residential only · 92 m away
- 1713 Piedmont AveNov 14, 2025Install irrigation system · 97 m away
- 1802 W St Johns AveJun 18, 2024Express remove 12 existing windows & replace with new vinyl windows of same size & operations · 98 m away
- 1717 Piedmont AveAug 28, 2026Addition and remodel - addition of a primary suite living room mudroom and covered porch. add a one car carport beyond the existing 1 car carport. relocate & refinish extg wood platform at back and add a pool with autofil with an rpz valve but no heater. remodel extg bath and kitchen · 98 m away
- 1704 W St Johns AveMar 27, 2024Running gas line for generator install · 103 m away
- 1717 Cullen AveApr 3, 2025Reconfigure bedroom bathroom kitchen living and dining · 103 m away