1800 Justin Ln
Austin, TX 78757
1800 Justin Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1800 Justin Ln, Austin, TX 78757. The most recent, filed May 2, 2024, covers: “Relace water yard line”.
Compiled from City of Austin records · updated May 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 2, 2024
- since May 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRelace water yard line
- AppliedApr 29, 2024
- IssuedMay 2, 2024
- WorkMay '24 – May '24
- Final inspectionMay 7, 2024
Passed final inspection May 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRelace water yard line
Relace water yard line
City of Austin permitPlumbing PermitFinal- Record
- 2024-053129 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1800 Justin Ln
What is being built at 1800 Justin Ln?
The latest filing (City of Austin permit 2024-053129 PP, May 2, 2024) covers relace water yard line.
How many permits and filings does 1800 Justin Ln have?
1 filing across 1 project, from May 2, 2024 to May 2, 2024.
Is there other construction near 1800 Justin Ln?
Yes. Nearby filings include 1812 Justin Ln (replacement of complete existing central heat and air system with or without duct work, Sep 18, 2026); 1806 Justin Ln (excavate 15 tunnel to repair main drain line under the house, Apr 9, 2025); 1718 Justin Ln (building 2 new 2 story sfr rear of main house, Jun 25, 2026).
How do I get alerts for new permits at 1800 Justin Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1812 Justin LnSep 18, 2026Replacement of complete existing central heat and air system with or without duct work · 22 m away
- 1806 Justin LnApr 9, 2025Excavate 15 tunnel to repair main drain line under the house · 49 m away
- 1718 Justin LnJun 25, 2026Building 2 new 2 story sfr rear of main house · 56 m away
- 1801 Cullen AveMar 3, 2025Replacement of an existing water heater gas tankless changeout · 59 m away
- 1803 Cullen AveFeb 20, 2025Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 1717 Justin LnSep 8, 2026(sharetts andrew) - installation of circuit for elec. vehicle charging station - esip · 77 m away
- 1807 Cullen AveOct 14, 2025Re-plumb gas lines to whole home · 80 m away
- 1717 Cullen AveApr 3, 2025Reconfigure bedroom bathroom kitchen living and dining · 84 m away
- 1810 Justin LnDec 5, 2023*partial demolition* addition & remodel of existing detached garage and existing 1 story single family house. addition connects garage and house new 2 story addition additional bathroom & bedroom [4beds 3baths]. interior remodel of kitchen/dining room · 88 m away
- 1715 Cullen AveOct 27, 2026Replacement of existing gas water heater with similar model · 92 m away
- 1809 Cullen AveFeb 26, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 2-ton vertical gas hvac system with like-for-like unit (hvac changeout/alteration); no structural change · 93 m away
- 7012 Yates AveSep 28, 2026Construct new driveway approach of 12 ft · 99 m away