2000 Pompton Dr
Austin, TX 78757
2000 Pompton Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2000 Pompton Dr, Austin, TX 78757 since January 16, 2024. The most recent, filed February 21, 2024, covers: “New detached pergola and concrete flatwork”.
Compiled from City of Austin records · updated Feb 21, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 21, 2024
- since Jan 16, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNew detached pergola and concrete flatwork
New detached pergola and concrete flatwork
City of Austin permitElectrical PermitFinal- Record
- 2023-134454 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New detached pergola and concrete flatwork
New detached pergola and concrete flatwork
City of Austin permitBuilding PermitFinal- Record
- 2023-134454 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2000 Pompton Dr
What is being built at 2000 Pompton Dr?
The latest filing (City of Austin permit 2023-134454 EP, February 21, 2024) covers new detached pergola and concrete flatwork.
How many permits and filings does 2000 Pompton Dr have?
2 filings across 2 projects, from January 16, 2024 to February 21, 2024.
Is there other construction near 2000 Pompton Dr?
Yes. Nearby filings include 2002 Pompton Dr (partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence, Apr 24, 2026); 2004 Pompton Dr (85 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home, Feb 27, 2025); 1908 Pompton Dr (tunnel below the foundation to repair drain lines, Feb 1, 2024).
How do I get alerts for new permits at 2000 Pompton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2002 Pompton DrApr 24, 2026Partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence · 21 m away
- 2004 Pompton DrFeb 27, 202585 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home · 36 m away
- 1908 Pompton DrFeb 1, 2024Tunnel below the foundation to repair drain lines · 41 m away
- 1911 Pompton DrJun 24, 2024Upgrade 125amp oh to 200amp oh · 46 m away
- 2003 Pompton DrJan 8, 2025Install ev charger · 47 m away
- 1913 Wooten DrFeb 23, 2026Replace all underfloor cast iron waste and vent piping with new pvc schedule 40 pipe and dwv fittings. we will tunnel to access the piping. approximately 6o of tunneling · 48 m away
- 1911 Wooten DrApr 17, 2026Replacement of an existing water heater replacing an existing 40 gal gas water heater like for like · 49 m away
- 2005 Pompton DrDec 26, 2025Interior remodel and carport enclosure - adding 2 bedrooms and a bathroom new finishes. all changes happening within existing footprint. carport enclosure · 59 m away
- 1909 Pompton DrAug 29, 2025Install 200amp oh service · 59 m away
- 1907 Wooten DrApr 2, 2026Inground prefabricated pool. no spa. no pp required. concrete decking · 78 m away
- 1907 Pompton DrAug 2, 2024Install/replace (200amp) meter base & main panel (overhead) · 78 m away
- 1910 Wooten DrJun 16, 2025Tunnel and replace all underfloor cast iron with new pvc. replace the sewer yard line. the tunnel is about 8 into the building toward the toilet with 2-3 side tunnels to the shower bathtub and lavatories. at the kitchen sink we will cut about a 15 x 15 section out of the sink cabinet and drywall to run the new drain line outside. at the washer we will cut about a 4x4 section of drywall to add a new washer box and run that through the outside wall. the new sewer yard line will run around the right side of the house across the front yard and driveway down to the existing city sewer connection at the easement. the kitchen/washer line will run around the left side of the house and connect to the front section of the sewer yard line. we are running about 14 of pipe underfloor 6 in the 2 walls and 200 outside regardless of what pipe existed · 92 m away