2004 Pompton Dr
Austin, TX 78757
2004 Pompton Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2004 Pompton Dr, Austin, TX 78757. The most recent, filed February 27, 2025, covers: “85 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home”.
Compiled from City of Austin records · updated Feb 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 27, 2025
- since Feb 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project85 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home
85 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home
City of Austin permitPlumbing PermitFinal- Record
- 2025-014334 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2004 Pompton Dr
What is being built at 2004 Pompton Dr?
The latest filing (City of Austin permit 2025-014334 PP, February 27, 2025) covers 85 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home.
How many permits and filings does 2004 Pompton Dr have?
1 filing across 1 project, from February 27, 2025 to February 27, 2025.
Is there other construction near 2004 Pompton Dr?
Yes. Nearby filings include 2002 Pompton Dr (partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence, Apr 24, 2026); 2000 Pompton Dr (new detached pergola and concrete flatwork, Feb 21, 2024); 2005 Pompton Dr (interior remodel and carport enclosure - adding 2 bedrooms and a bathroom new finishes. all changes happening within existing footprint. carport enclosure, Dec 26, 2025).
How do I get alerts for new permits at 2004 Pompton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2002 Pompton DrApr 24, 2026Partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence · 16 m away
- 2000 Pompton DrFeb 21, 2024New detached pergola and concrete flatwork · 36 m away
- 2005 Pompton DrDec 26, 2025Interior remodel and carport enclosure - adding 2 bedrooms and a bathroom new finishes. all changes happening within existing footprint. carport enclosure · 41 m away
- 2003 Pompton DrJan 8, 2025Install ev charger · 48 m away
- 1913 Wooten DrFeb 23, 2026Replace all underfloor cast iron waste and vent piping with new pvc schedule 40 pipe and dwv fittings. we will tunnel to access the piping. approximately 6o of tunneling · 54 m away
- 2010 Pompton DrJun 10, 2025Tunnel under the house and follow the main line 25 until the main drain line transitions from cast iron to pvc and expose the hall bathroom drains. excavation crew would then come back to the kitchen sink tie in and follow the kitchen sink drain line 15 exposing the kitchen sink drain · 69 m away
- 1911 Wooten DrApr 17, 2026Replacement of an existing water heater replacing an existing 40 gal gas water heater like for like · 69 m away
- 1911 Pompton DrJun 24, 2024Upgrade 125amp oh to 200amp oh · 73 m away
- 1908 Pompton DrFeb 1, 2024Tunnel below the foundation to repair drain lines · 77 m away
- 2012 Pompton DrFeb 24, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 89 m away
- 1909 Pompton DrAug 29, 2025Install 200amp oh service · 92 m away
- 1910 Wooten DrJun 16, 2025Tunnel and replace all underfloor cast iron with new pvc. replace the sewer yard line. the tunnel is about 8 into the building toward the toilet with 2-3 side tunnels to the shower bathtub and lavatories. at the kitchen sink we will cut about a 15 x 15 section out of the sink cabinet and drywall to run the new drain line outside. at the washer we will cut about a 4x4 section of drywall to add a new washer box and run that through the outside wall. the new sewer yard line will run around the right side of the house across the front yard and driveway down to the existing city sewer connection at the easement. the kitchen/washer line will run around the left side of the house and connect to the front section of the sewer yard line. we are running about 14 of pipe underfloor 6 in the 2 walls and 200 outside regardless of what pipe existed · 97 m away