2003 Pompton Dr
Austin, TX 78757
2003 Pompton Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2003 Pompton Dr, Austin, TX 78757 since November 28, 2023. The most recent, filed January 8, 2025, covers: “Install ev charger”.
Compiled from City of Austin records · updated Jan 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jan 8, 2025
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall ev charger
Install ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-000129 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Relocate electrical meter and add main disconnect
Relocate electrical meter and add main disconnect
City of Austin permitElectrical PermitFinal- Record
- 2023-148712 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2003 Pompton Dr
What is being built at 2003 Pompton Dr?
The latest filing (City of Austin permit 2025-000129 EP, January 8, 2025) covers install ev charger.
How many permits and filings does 2003 Pompton Dr have?
2 filings across 2 projects, from November 28, 2023 to January 8, 2025.
Is there other construction near 2003 Pompton Dr?
Yes. Nearby filings include 2005 Pompton Dr (interior remodel and carport enclosure - adding 2 bedrooms and a bathroom new finishes. all changes happening within existing footprint. carport enclosure, Dec 26, 2025); 2002 Pompton Dr (partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence, Apr 24, 2026); 1911 Pompton Dr (upgrade 125amp oh to 200amp oh, Jun 24, 2024).
How do I get alerts for new permits at 2003 Pompton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2005 Pompton DrDec 26, 2025Interior remodel and carport enclosure - adding 2 bedrooms and a bathroom new finishes. all changes happening within existing footprint. carport enclosure · 27 m away
- 2002 Pompton DrApr 24, 2026Partial demolition of northern facing exterior wall and north half of roof rear facing kitchen dining rm & existing master bath walls rear facing water heater closet door & wall; remodel to convert garage storage area into laundry/pantry rm convert water heater closet into addtl. kitchen space turn washer space into addtl. living rm space raise ceilings in living rm dining rm & kitchen remove door to current master bedrm to create hallway increase size of existing master bedrm east facing window existing master bedrm will now become bedrm #1 most of existing kitchen will become laundry rm/pantry move water heater and replace with tankless on-demand unit; addition of a new master bedroom master bathroom and extend existing master bathroom to existing 1 story single-family residence · 43 m away
- 1911 Pompton DrJun 24, 2024Upgrade 125amp oh to 200amp oh · 44 m away
- 2000 Pompton DrFeb 21, 2024New detached pergola and concrete flatwork · 47 m away
- 2004 Pompton DrFeb 27, 202585 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 each side of home · 48 m away
- 2004 Belford DrNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 1909 Pompton DrAug 29, 2025Install 200amp oh service · 68 m away
- 2010 Belford DrAug 7, 2025Install modern day service riser updated milbank meter can with emergency bypass level rate service for 200a install new outdoor main disconnect and replace main electrical panel · 73 m away
- 1908 Pompton DrFeb 1, 2024Tunnel below the foundation to repair drain lines · 78 m away
- 1913 Wooten DrFeb 23, 2026Replace all underfloor cast iron waste and vent piping with new pvc schedule 40 pipe and dwv fittings. we will tunnel to access the piping. approximately 6o of tunneling · 91 m away
- 1907 Pompton DrAug 2, 2024Install/replace (200amp) meter base & main panel (overhead) · 92 m away
- 1911 Wooten DrApr 17, 2026Replacement of an existing water heater replacing an existing 40 gal gas water heater like for like · 96 m away