2007 Payne Ave
Austin, TX 78757
Two-unit, two-story home permitted at 2007 Payne Ave
Austin permits filed April 16, 2025, describe a new two-story, two-unit residential structure at 2007 Payne Ave. Plans include a first-floor workshop with a covered patio and a second-floor studio with a full bath and covered balcony. A separate permit filed March 12, 2025, covers demolition of a 220-square-foot detached structure; a driveway approach permit followed in March 2026.
Summarized from City of Austin records · updated Mar 5, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Mar 5, 2026
- since Mar 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 12 ft. no sidewalk inspection per plan review
- AppliedMar 2, 2025
- IssuedMar 5, 2026
- WorkMar '26 – Apr '26
- Final inspectionApr 13, 2026
Passed final inspection Apr 13, 2026.
Permit & project history
6 projectsConstruct new driveway approach of 12 ft. no sidewalk inspection per plan review
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review
City of Austin permitDriveway / SidewalksFinal- Record
- 2026-023624 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
City of Austin permitMechanical PermitFinal- Record
- 2025-044137 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
City of Austin permitElectrical PermitFinal- Record
- 2025-044137 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
City of Austin permitPlumbing PermitFinal- Record
- 2025-044137 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
Two-unit use: new construction single family residential 2- story structure to include: workshop with covered patio on 1st floor; exterior stairs leading to 2nd floor; 2nd floor to include: studio space with full bath and covered balcony. new approach to be installed
City of Austin permitBuilding PermitFinal- Record
- 2025-044137 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of detached structure 220 sq ft circa 1950
Total demolition of detached structure 220 sq ft circa 1950
City of Austin permitBuilding PermitFinal- Record
- 2025-028787 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2007 Payne Ave
What is being built at 2007 Payne Ave?
Austin permit 2025-044137 BP describes a new two-story, two-unit residential structure. Plans include a workshop and covered patio on the first floor, plus a studio with a full bath and covered balcony on the second.
When was the new home at 2007 Payne Ave permitted?
The building permit was filed April 16, 2025. Electrical, plumbing and mechanical permits followed between June and October 2025.
Is 2007 Payne Ave a two-unit project?
The permit description identifies the use as two-unit and describes a new single-family residential structure. It lists a first-floor workshop and an upstairs studio.
Was anything demolished at 2007 Payne Ave?
Yes. Austin permit 2025-028787 BP, filed March 12, 2025, covers total demolition of a detached structure measuring 220 square feet.
Are there plans for a new driveway at 2007 Payne Ave?
The residential permit description includes a new approach. A separate driveway approach permit, 2026-023624 DS, was filed March 5, 2026.
What do the permits say about the second floor at 2007 Payne Ave?
The permit description says the second floor will include studio space with a full bath and a covered balcony, reached by exterior stairs.
Also being built nearby
All of 78757- 2009 Payne AveMay 8, 2026Irrigation install · 16 m away
- 2008 Payne AveSep 23, 2024Install evse · 41 m away
- 2004 Payne AveJul 26, 2025Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 2004 Pequeno StJan 21, 2026Construct new driveway approach of 14 ft. no sidewalk inspection per plan review · 55 m away
- 2002 Pequeno StJul 28, 2025Upgrade main service · 57 m away
- 2008 Pequeno StFeb 20, 2026Install irrigation system · 68 m away
- 1916 Pequeno StSep 12, 2024Installation of irrigation system · 76 m away
- 2010 Pequeno StSep 15, 2026Replacement of tankless water heater like for like · 78 m away
- 1918 Payne AveJul 22, 2024Install irrigation system · 87 m away
- 1914 Pequeno StJan 30, 2024Excavate and repair sewer line in the front yard · 91 m away
- 2001 Pequeno StSep 4, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 96 m away
- 1917 Payne AveJun 26, 2025Change of use from accessory structure to adu. add plumbing for kitchen sink and wiring for oven · 103 m away