groundranger
Historic · latest filing Sep 2024Residential

2019 Hardy Cir

Austin, TX 78757

2019 Hardy Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 2019 Hardy Cir, Austin, TX 78757. The most recent, filed September 25, 2024, covers: “Express: remove and replace plywood roof decking roof decking due to hail damage before replacing shingle roofing system (1667 sq ft)”.

Compiled from City of Austin records · updated Sep 25, 2024

Projects
1
1 filings
Latest filing
Sep 25, 2024
since Sep 25, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: remove and replace plywood roof decking roof decking due to hail damage before replacing shingle roofing system (1667 sq ft)

  1. AppliedSep 9, 2024
  2. IssuedSep 25, 2024
  3. WorkSep '24 – Oct '24
  4. Final inspectionOct 4, 2024

Passed final inspection Oct 4, 2024.

2 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Express: remove and replace plywood roof decking roof decking due to hail damage before replacing shingle roofing system (1667 sq ft)

    Express: remove and replace plywood roof decking roof decking due to hail damage before replacing shingle roofing system (1667 sq ft)

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2019 Hardy Cir

What is being built at 2019 Hardy Cir?

The latest filing (City of Austin permit 2024-122007 BP, September 25, 2024) covers express: remove and replace plywood roof decking roof decking due to hail damage before replacing shingle roofing system (1667 sq ft).

How many permits and filings does 2019 Hardy Cir have?

1 filing across 1 project, from September 25, 2024 to September 25, 2024.

Is there other construction near 2019 Hardy Cir?

Yes. Nearby filings include 2015 Hardy Cir (70ft tunnel/sewer line repair removing damaged piping replacing with pvc underneath foundation of the home, Apr 17, 2026); 2007 Pasadena Dr (install irrigation system, Jun 17, 2025); 2013 Hardy Cir (repipe hot and. cold water lines for 1st floor fixtures reconnecting pex lines to copper for second floor bathroom and replacing 50 gallon water heater, Sep 8, 2025).

How do I get alerts for new permits at 2019 Hardy Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed