2605 Twin Oaks Dr
Austin, TX 78757
2605 Twin Oaks Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2605 Twin Oaks Dr, Austin, TX 78757. The most recent, filed April 10, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Apr 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2025
- since Apr 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedApr 8, 2025
- IssuedApr 10, 2025
- WorkApr '25 – Jun '25
- Final inspectionJun 20, 2025
Passed final inspection Jun 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-042359 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2605 Twin Oaks Dr
What is being built at 2605 Twin Oaks Dr?
The latest filing (City of Austin permit 2025-042359 PP, April 10, 2025) covers replacement of an existing water heater.
How many permits and filings does 2605 Twin Oaks Dr have?
1 filing across 1 project, from April 10, 2025 to April 10, 2025.
Is there other construction near 2605 Twin Oaks Dr?
Yes. Nearby filings include 2601 Twin Oaks Dr (corner lot; construct new driveway approach of 18 ft, Aug 5, 2024); 2604 Twin Oaks Dr (base: installing a backup battery system and additional meter socket, Aug 13, 2026); 2604 Cavileer Ave (replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet and will cross uner driveway, Oct 20, 2026).
How do I get alerts for new permits at 2605 Twin Oaks Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2601 Twin Oaks DrAug 5, 2024Corner lot; construct new driveway approach of 18 ft · 47 m away
- 2604 Twin Oaks DrAug 13, 2026Base: installing a backup battery system and additional meter socket · 51 m away
- 2604 Cavileer AveOct 20, 2026Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet and will cross uner driveway · 52 m away
- 2606 Cavileer AveDec 17, 2024New pool for single family residence · 57 m away
- 2602 Cavileer AveSep 22, 2026Replace water line from meter to the home a total of 40 feet. replace water lines under the foundation of pier and beam home for 2 full bathrooms kitchen and washer and water heater under the foundation · 62 m away
- 2608 Twin Oaks DrDec 10, 2025Upgrade electrical service from 225 amp to a 300 amp service · 69 m away
- 6413 Cary DrSep 10, 202675 tunnel below the foundation to replace entire drain system and 35 trench to reroute sewer from left side of home to city tap near side street on the left.. 3 access holes - front right left · 96 m away
- 6507 Nasco DrFeb 2, 2026Tx gas is relocating the main line feeding the house and needs to relocate the meter due to being directly under a window and under 3 from a door way · 98 m away
- 6505 Nasco DrDec 23, 2024Install irrigation system · 100 m away
- 6503 Nasco DrMay 29, 2025Install level 2 ev charger · 102 m away
- 2703 Twin Oaks DrSep 5, 2024New inground swimming pool with reqd enclosure device · 103 m away
- 2603 Park View DrMar 27, 2026Add 1 (60) amp emporia from the outside main electrical panel to the garage location with a 60 amp 240 volt ch breaker · 114 m away