2809 Greenlawn Pkwy
Austin, TX 78757
Plumbing replacement permitted at 2809 Greenlawn Pkwy
A plumbing permit filed March 4, 2026, covers replacing cast-iron pipes serving the bathroom, kitchen and laundry with Schedule 40 PVC. The permit describes tunneling beneath the house’s foundation and creating three access openings.
Summarized from City of Austin records · updated Mar 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2026
- since Mar 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house
- AppliedMar 2, 2026
- IssuedMar 4, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 31, 2026
Passed final inspection Mar 31, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house
Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house
City of Austin permitPlumbing PermitFinal- Record
- 2026-025105 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2809 Greenlawn Pkwy
What is happening at 2809 Greenlawn Pkwy in Austin?
A City of Austin plumbing permit describes replacing cast-iron pipes for the bathroom, kitchen and laundry with Schedule 40 PVC. The work is to be done by tunneling under the foundation.
When was the plumbing work at 2809 Greenlawn Pkwy permitted?
The permit was filed March 4, 2026. Its number is 2026-025105 PP.
What pipes are being replaced at 2809 Greenlawn Pkwy?
The permit describes replacing cast-iron pipes serving the bathroom, kitchen and laundry with Schedule 40 PVC.
Will the work at 2809 Greenlawn Pkwy involve tunneling?
Yes. The permit describes tunneling beneath the foundation and creating three access openings: at the front, back and side of the house.
Is a new restaurant being built at 2809 Greenlawn Pkwy?
The permit on record describes plumbing work at a house, not construction of a restaurant.
Also being built nearby
All of 78757- 2807 Greenlawn PkwyAug 5, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 4 ton 14 seer2 single stage condenser evaporator coil and gas furnace · 21 m away
- 2903 Greenlawn PkwyMay 23, 2024New construction accessory to primary use detached structure 1-story 1 bath with office/ living room and uncovered wood deck · 71 m away
- 2801 Greenlawn PkwyOct 19, 2026Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 2905 Greenlawn PkwyJun 26, 2026Sewer line repair via tunneling yard sewer line repair · 95 m away
- 2901 Pinecrest DrAug 19, 2025Deck - adding an uncovered wood deck to an existing residence · 95 m away
- 2904 Pinecrest DrMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 2906 Pinecrest DrAug 20, 2024Tunneling under foundation to repair broken drain lines **per pc: all drain lines under house · 116 m away
- 2907 Greenlawn PkwyOct 17, 2024Irrigation system · 119 m away
- 2908 Pinecrest DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 136 m away
- 2907 Pinecrest DrMar 3, 2026Ev charger install · 138 m away
- 2710 Greenlawn PkwyMay 16, 2024Repair water heater by adding combustible air vent and leveling water heater adding expansion tank to water heater and rerunning water heater vent. adding 18inch platform to water heater · 140 m away
- 2906 Greenlawn PkwyAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 143 m away
More restaurants in 78757.