3000 White Rock Dr
Austin, TX 78757
3000 White Rock Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3000 White Rock Dr, Austin, TX 78757. The most recent, filed May 13, 2024, covers: “Replacement of complete oh 200 amp service including meter”.
Compiled from City of Austin records · updated May 13, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 13, 2024
- since May 13, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete oh 200 amp service including meter
- AppliedMay 7, 2024
- IssuedMay 13, 2024
- WorkMay '24 – Sep '24
- Final inspectionSep 20, 2024
Passed final inspection Sep 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete oh 200 amp service including meter
Replacement of complete oh 200 amp service including meter
City of Austin permitElectrical PermitFinal- Record
- 2024-056892 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3000 White Rock Dr
What is being built at 3000 White Rock Dr?
The latest filing (City of Austin permit 2024-056892 EP, May 13, 2024) covers replacement of complete oh 200 amp service including meter.
How many permits and filings does 3000 White Rock Dr have?
1 filing across 1 project, from May 13, 2024 to May 13, 2024.
Is there other construction near 3000 White Rock Dr?
Yes. Nearby filings include 3002 White Rock Dr (200 amp service upgrade with new 200 amp meter, Mar 20, 2025); 6102 Janey Dr (construct new driveway approach of 15 ft. no sidewalk inspection per plan review.*shay, Dec 8, 2023); 3003 White Rock Dr (install new 9.46 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential, Nov 17, 2025).
How do I get alerts for new permits at 3000 White Rock Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3002 White Rock DrMar 20, 2025200 amp service upgrade with new 200 amp meter · 25 m away
- 6102 Janey DrDec 8, 2023Construct new driveway approach of 15 ft. no sidewalk inspection per plan review.*shay · 26 m away
- 3003 White Rock DrNov 17, 2025Install new 9.46 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential · 53 m away
- 2904 White Rock DrOct 30, 2026Base: installing a backup battery system and additional meter socket · 53 m away
- 3004 White Rock DrJun 11, 2026Interior remodel - renovating the interior of the home to be an open format floor plan with the removal of the central wall. new drywall to be installed and patched in areas exceeding 120 linear feet plumbing fixtures moved from south wall to north wall in primary bathroom window replacement like for like in the entire home and a french door to window change in the primary bedroom (egress area but with no change to width). gas line to shift from the west to south wall of the kitchen. attached carport and wood deck to be removed · 56 m away
- 2907 White Rock DrFeb 23, 2026Install 200amp oh service · 60 m away
- 3005 White Rock DrApr 23, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 68 m away
- 6105 Janey DrJan 14, 2025Express: removing and replacing 11 windows · 70 m away
- 2905 White Rock DrMar 13, 2025Interior remodel bathroom wall will be moved out 12 inches closet behind the shower will be walled off for the shower install 5x5 shower pan plumber will be moving the water lines and installing the shower valves plumber will be relocating drain pipe for the shower pan. electrician to run dedicated circuit to new tankless wh · 77 m away
- 6107 Janey DrJul 23, 2025Eplan: residential expedited review - addition and remodel of existing 2-story single-family residence. addition on 1st floor includes family room master suite & covered porch. interior remodel · 80 m away
- 6106 Janey DrMay 14, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton ac system and repair or rebuild of the supply air plenum · 80 m away
- 6102 Rickey DrDec 16, 2024Interior remodel · 94 m away