3006 Skylark Dr
Austin, TX 78757
3006 Skylark Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3006 Skylark Dr, Austin, TX 78757. The most recent, filed July 11, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 11, 2024
- since Jul 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 27, 2024
- IssuedJul 11, 2024
- !WorkJul '24 – Jan '25
- Final inspection
Marked expired Jan 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-080457 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3006 Skylark Dr
What is being built at 3006 Skylark Dr?
The latest filing (City of Austin permit 2024-080457 MP, July 11, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3006 Skylark Dr have?
1 filing across 1 project, from July 11, 2024 to July 11, 2024.
Is there other construction near 3006 Skylark Dr?
Yes. Nearby filings include 3100 Skylark Dr (71 tunnel below the foundation to replace entire cast iron drain system 17 trench to reroute kitchen branch line to the yard sewer. access holes -1 front 2 back, Jan 22, 2025); 3002 Skylark Dr (addition/remodel- ir to convert existing bedroom to primary bedroom with ensuite br and walk-in closet. remove the existing noncompliant carport. retroactively permit an existing uncovered deck and covered back porch, Nov 12, 2026); 3005 Silverleaf Dr (install irrigation system, Jan 13, 2026).
How do I get alerts for new permits at 3006 Skylark Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3100 Skylark DrJan 22, 202571 tunnel below the foundation to replace entire cast iron drain system 17 trench to reroute kitchen branch line to the yard sewer. access holes -1 front 2 back · 26 m away
- 3002 Skylark DrNov 12, 2026Addition/remodel- ir to convert existing bedroom to primary bedroom with ensuite br and walk-in closet. remove the existing noncompliant carport. retroactively permit an existing uncovered deck and covered back porch · 44 m away
- 3005 Silverleaf DrJan 13, 2026Install irrigation system · 51 m away
- 3009 Silverleaf DrAug 19, 2026New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio · 55 m away
- 3003 Silverleaf DrAug 17, 2026Base: installing a backup battery system and additional meter socket · 61 m away
- 3001 Silverleaf DrNov 2, 2026Trench and replace sewer yard line from cleanout out to city tap · 77 m away
- 3103 Silverleaf DrOct 4, 2024Construct new driveway approach of 23 ft and curb & gutter of 18.5 ft. **no sidewalk inspection per bp · 86 m away
- 3100 Stardust DrDec 3, 2024Tunnel from exterior of home and under foundation to replace cast iron drain system up to bottom of foundation with new schedule 40 pvc · 90 m away
- 3006 Silverleaf DrMay 26, 20251-story addition to existing 2-story residence. expansion of 1st floor and covered porch. interior remodel · 91 m away
- 3004 Stardust DrFeb 14, 2024New irrigation system · 94 m away
- 2909 Silverleaf DrNov 4, 2026Addition/interior remodel to existing single family residence adding 2nd story bedroom suite above garage with bathroom expand primary bath/closet build new attached sunroom and porch 4 bed/3 bath rolling in expired permit #2009-080154 mp change out hvac to residence · 98 m away
- 3004 Silverleaf DrMar 24, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 98 m away