3305 Pinecrest Dr
Austin, TX 78757
3305 Pinecrest Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3305 Pinecrest Dr, Austin, TX 78757. The most recent, filed May 25, 2024, covers: “Upgrade existing overhead service to 120/240 volt 200 amp”.
Compiled from City of Austin records · updated May 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 25, 2024
- since May 25, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectUpgrade existing overhead service to 120/240 volt 200 amp
Upgrade existing overhead service to 120/240 volt 200 amp
City of Austin permitElectrical PermitFinal- Record
- 2024-063032 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3305 Pinecrest Dr
What is being built at 3305 Pinecrest Dr?
The latest filing (City of Austin permit 2024-063032 EP, May 25, 2024) covers upgrade existing overhead service to 120/240 volt 200 amp.
How many permits and filings does 3305 Pinecrest Dr have?
1 filing across 1 project, from May 25, 2024 to May 25, 2024.
Is there other construction near 3305 Pinecrest Dr?
Yes. Nearby filings include 3301 Pinecrest Dr (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Jul 6, 2026); 3300 Pinecrest Dr (reroute kitchen and washer drain line around the back side of the home from the left side to the righ side of the home. tunnel under hall bathroom to repipe cast iron drain lines to pvc and reroute to the right side of the home. tunnel under the master bathroom to repipe cast iron pipe to pvc as well to the sewer line. total length of tunnel is 25 feet, Nov 10, 2025); 3207 Pinecrest Dr (tunnel below the foundation to repair drain lines, Dec 28, 2023).
How do I get alerts for new permits at 3305 Pinecrest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3301 Pinecrest DrJul 6, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 43 m away
- 3300 Pinecrest DrNov 10, 2025Reroute kitchen and washer drain line around the back side of the home from the left side to the righ side of the home. tunnel under hall bathroom to repipe cast iron drain lines to pvc and reroute to the right side of the home. tunnel under the master bathroom to repipe cast iron pipe to pvc as well to the sewer line. total length of tunnel is 25 feet · 63 m away
- 3207 Pinecrest DrDec 28, 2023Tunnel below the foundation to repair drain lines · 66 m away
- 3309 Greenlawn PkwyOct 22, 2026Tunnel approximately 25 feet to repair the collapsed pipe and correct the back-pitched piping near the kitchen sink · 94 m away
- 3204 Pinecrest DrDec 1, 2025Replacement of an existing water heater installing like/like g water heater · 95 m away
- 3301 Greenlawn PkwyNov 2, 2025Repair and secure existing service mast · 106 m away
- 3201 Pinecrest DrSep 30, 2025New above-ground pool · 131 m away
- 3306 Greenlawn PkwyAug 4, 20252nd story addition to existing 1-story single family residence. adding 2 bed/2 bath (5 bed/4 bath total) · 142 m away
- 3310 Greenlawn PkwyMay 13, 2026Tunnel under foundation to replace cast iron drain for 2 full bathrooms kitchen and washer drain to sch 40 pvc pipe. total length of tunnel is approximately 90 feet with 3 access holes one located in the back right side of home the second will be in the front where drain line exits the foundation. sewer line will be repalced from the home to the city tap connection that runs from the front right corner of the home to the front right corner of the property · 149 m away
- 3201 Greenlawn PkwyJan 29, 2024New inground pool and spa with reqd enclosure device for existing 1-story sfr · 157 m away
- 3309 Stardust DrAug 13, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 184 m away
- 7101 S Mopac Expy NbSep 8, 2026Replace 29 existing rtus with like-for-like units. new controls for bas · 185 m away