3311 Stardust Dr
Austin, TX 78757
Electrical and HVAC work at 3311 Stardust Dr
City of Austin permits indicate updates to the electrical service loop and replacement of the existing central heating and air system at 3311 Stardust Dr. The mechanical permit was filed May 1, 2025, and finalized; the electrical permit was filed October 2, 2026, and is active.
Summarized from City of Austin records · updated Oct 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 2, 2026
- since May 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayRebuild service loop bring up to date
- AppliedJul 23, 2026
- IssuedOct 2, 2026
- WorkOct '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsRebuild service loop bring up to date
Rebuild service loop bring up to date
City of Austin permitElectrical PermitActive- Record
- 2026-095582 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work full system replacement
Replacement of complete existing central heat and air system with or without duct work full system replacement
City of Austin permitMechanical PermitFinal- Record
- 2025-053456 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3311 Stardust Dr
What work is happening at 3311 Stardust Dr in Austin?
City of Austin records list an electrical service-loop update and replacement of the existing central heat and air system. They do not describe a new building.
Is a new house being built at 3311 Stardust Dr?
The listed permits describe work on existing systems: a central heat and air replacement and an electrical service-loop update.
When was the HVAC permit filed for 3311 Stardust Dr?
The mechanical permit, 2025-053456 MP, was filed May 1, 2025. Its status is Final.
What does the electrical permit at 3311 Stardust Dr cover?
Permit 2026-095582 EP describes rebuilding and bringing the service loop up to date. It was filed October 2, 2026, and is listed as Active.
Is the work at 3311 Stardust Dr permitted?
The records include two City of Austin permits: mechanical permit 2025-053456 MP, listed as Final, and electrical permit 2026-095582 EP, listed as Active.
Also being built nearby
All of 78757- 3309 Stardust DrAug 13, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 16 m away
- 3310 Greenlawn PkwyMay 13, 2026Tunnel under foundation to replace cast iron drain for 2 full bathrooms kitchen and washer drain to sch 40 pvc pipe. total length of tunnel is approximately 90 feet with 3 access holes one located in the back right side of home the second will be in the front where drain line exits the foundation. sewer line will be repalced from the home to the city tap connection that runs from the front right corner of the home to the front right corner of the property · 40 m away
- 3306 Greenlawn PkwyAug 4, 20252nd story addition to existing 1-story single family residence. adding 2 bed/2 bath (5 bed/4 bath total) · 64 m away
- 3304 Stardust DrMar 19, 2024Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 3303 Stardust DrSep 17, 2026Complete 200amp main service replacement · 82 m away
- 3309 Greenlawn PkwyOct 22, 2026Tunnel approximately 25 feet to repair the collapsed pipe and correct the back-pitched piping near the kitchen sink · 95 m away
- 7101 S Mopac Expy NbSep 8, 2026Replace 29 existing rtus with like-for-like units. new controls for bas · 103 m away
- 3301 Stardust DrAug 24, 2026Expresss: replace 5 existing windows with new windows of the same size; like for like install · 104 m away
- 3300 Stardust DrOct 21, 2026Underground gas line for generator · 112 m away
- 3207 Stardust DrSep 24, 2025Installation of roof mounted solar system · 124 m away
- 3301 Greenlawn PkwyNov 2, 2025Repair and secure existing service mast · 144 m away
- 3300 Pinecrest DrNov 10, 2025Reroute kitchen and washer drain line around the back side of the home from the left side to the righ side of the home. tunnel under hall bathroom to repipe cast iron drain lines to pvc and reroute to the right side of the home. tunnel under the master bathroom to repipe cast iron pipe to pvc as well to the sewer line. total length of tunnel is 25 feet · 167 m away