5805 Shoal Creek Blvd
Austin, TX 78757
5805 Shoal Creek Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 5805 Shoal Creek Blvd, Austin, TX 78757. The most recent, filed October 8, 2024, covers: “Installation of power for a level 2 ev charger”.
Compiled from City of Austin records · updated Oct 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2024
- since Oct 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of power for a level 2 ev charger
- AppliedOct 2, 2024
- IssuedOct 8, 2024
- WorkOct '24 – Apr '25
- Final inspectionFeb 26, 2025
Passed final inspection Feb 26, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstallation of power for a level 2 ev charger
Installation of power for a level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-133685 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5805 Shoal Creek Blvd
What is being built at 5805 Shoal Creek Blvd?
The latest filing (City of Austin permit 2024-133685 EP, October 8, 2024) covers installation of power for a level 2 ev charger.
How many permits and filings does 5805 Shoal Creek Blvd have?
1 filing across 1 project, from October 8, 2024 to October 8, 2024.
Is there other construction near 5805 Shoal Creek Blvd?
Yes. Nearby filings include 5807 Shoal Creek Blvd (construct new driveway approach of 18 ft. no sidewalk inspection per plan review, Jan 13, 2025); 5803 Shoal Creek Blvd (tunnel under the foundation to replace the cast iron drain lines. there will be two access holes: one in front and one on the side, Sep 1, 2026); 5804 Cary Dr (installing a new irrigation system, Oct 29, 2026).
How do I get alerts for new permits at 5805 Shoal Creek Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 5807 Shoal Creek BlvdJan 13, 2025Construct new driveway approach of 18 ft. no sidewalk inspection per plan review · 22 m away
- 5803 Shoal Creek BlvdSep 1, 2026Tunnel under the foundation to replace the cast iron drain lines. there will be two access holes: one in front and one on the side · 27 m away
- 5804 Cary DrOct 29, 2026Installing a new irrigation system · 42 m away
- 5801 Shoal Creek BlvdJan 5, 2024Repair riser and meter · 50 m away
- 5802 Shoal Creek BlvdNov 30, 2023*partial demolition* addition/remodel with porch to existing home and second floor bedroom new backyard patio · 65 m away
- 5705 Shoal Creek BlvdJul 1, 2025Temporary power pole · 75 m away
- 5800 Shoal Creek BlvdSep 9, 2026Express: replace 6 windows into existing openings no structural changes · 78 m away
- 5900 Cary DrJun 11, 2025Express: existing foundation repair as per scope of work attached · 81 m away
- 5800 Cary DrMar 28, 2024Expedited review - new pool general contractor is responsible to verify the scope of work on 2023 122794 tp completes the proper mitigation to clear out the 2022 102244 ecv enterprise violation. see permit conditions · 87 m away
- 5902 Shoal Creek BlvdMar 19, 2026Partial demolition 2-story addition/interior remodel to existing single family residence. add 2 bedrooms 3 bathrooms game room balcony storage and covered patio. new total: 4 bed/5 bath · 88 m away
- 2702 Allandale RdNov 11, 202540 tunnel below the foundation to replace remainder of cast iron drain lines. 2 access holes - front and back · 93 m away
- 5803 Cary DrMay 26, 2026Enclosure of existing carport attached to house · 106 m away