6205 Bull Creek Rd
Austin, TX 78757
6205 Bull Creek Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 6205 Bull Creek Rd, Austin, TX 78757. The most recent, filed November 11, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Nov 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2024
- since Nov 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedOct 28, 2024
- IssuedNov 11, 2024
- WorkNov '24 – Jan '25
- Final inspectionJan 16, 2025
Passed final inspection Jan 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-144655 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6205 Bull Creek Rd
What is being built at 6205 Bull Creek Rd?
The latest filing (City of Austin permit 2024-144655 PP, November 11, 2024) covers replacement of an existing water heater.
How many permits and filings does 6205 Bull Creek Rd have?
1 filing across 1 project, from November 11, 2024 to November 11, 2024.
Is there other construction near 6205 Bull Creek Rd?
Yes. Nearby filings include 6202 Bull Creek Rd (replacement of complete existing central heat and air system with or without duct work, Jun 13, 2024); 6104 Woodview Ave (express: foundation repair, Mar 11, 2024); 6200 Woodview Ave (replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal heat pump, Aug 15, 2026).
How do I get alerts for new permits at 6205 Bull Creek Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 6202 Bull Creek RdJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 13 m away
- 6104 Woodview AveMar 11, 2024Express: foundation repair · 73 m away
- 6200 Woodview AveAug 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal heat pump · 81 m away
- 6205 Nasco DrMar 30, 2026Generator gas line · 84 m away
- 6100 Bull Creek RdSep 3, 2026Replacement of an existing water heater replacing like/like g water heater · 87 m away
- 6102 Woodview AveJun 12, 2025Request to disconnect - rasing to higher level and relocating 200a ats (currently located at ground level) · 88 m away
- 6105 Bull Creek RdDec 19, 2024Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 6106 Bull Creek RdNov 13, 2025Replacement of an existing water heater changing out gas tank water heater for the same · 102 m away
- 2500 White Rock DrJun 3, 2025Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 6101 Bull Creek RdOct 30, 2024Replacement of an existing water heater · 103 m away
- 6104 Bull Creek RdJul 29, 2026Base: installing a backup battery system and additional meter socket · 104 m away
- 6100 Woodview AveMar 1, 2026Tunnel under the foundation to repair broken pvc pipes; two access holes at the back of the house and at the side of the house. at the master bathroom there was a broken pipe and near the side access hole there was a break in the main line · 104 m away