6301 Treadwell Blvd
Austin, TX 78757 · Austin Independent School District
Secure vestibule renovation registered at Gullett Elementary
A 1,506-square-foot renovation at Gullett Elementary School is registered to add a secure vestibule and security hardware, secure the existing reception area, and reconfigure existing restrooms and a book storage area. The TDLR project registration was filed Sept. 3, 2024. A separate Austin electrical permit dated Nov. 29, 2024 records a 200-amp service upgrade. TDLR lists the applicant’s estimated project cost as $711,414.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Nov 29, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 29, 2024
- since Sep 3, 2024
- Largest scope
- 1,506 sf
- Estimated cost
- $711K
- state registration
Where this project stands
Finaled200 amp service upgrade new 200 amp meter new 200 amp load center with mcb whole house surge protection. additional grounding inter-system ground
- AppliedNov 17, 2024
- IssuedNov 29, 2024
- WorkNov '24 – Dec '24
- Final inspectionDec 30, 2024
Passed final inspection Dec 30, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projects200 amp service upgrade new 200 amp meter new 200 amp load center with mcb whole house surge protection. additional grounding inter-system ground
200 amp service upgrade new 200 amp meter new 200 amp load center with mcb whole house surge protection. additional grounding inter-system ground
City of Austin permitElectrical PermitFinal- Record
- 2024-152653 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Creating secure vestibule, securing existing reception area, addition of security hardware to new vestibule space and reception, reconfiguration of existing restrooms and book storage area. — gullett elementary school
TDLR project registrationRenovation/AlterationProject Closed1,506 sq ft$711K est.- Project #
- TABS2025000055
- Tenant / owner
- Secure Vestibule At Gullett Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 6301 Treadwell Blvd
What is being built at 6301 Treadwell Blvd in Austin?
TDLR records a renovation at Gullett Elementary School to add a secure vestibule and security hardware, secure the existing reception area, and reconfigure restrooms and a book storage area. The registration was filed Sept. 3, 2024.
Is Gullett Elementary getting a new secure vestibule?
A TDLR project registration describes creating a secure vestibule and adding security hardware to the vestibule and reception area. The registration was filed Sept. 3, 2024.
When was the Gullett Elementary renovation permitted?
The TDLR registration for the secure vestibule renovation was filed Sept. 3, 2024. A separate Austin electrical permit, 2024-152653 EP, was dated Nov. 29, 2024.
How much will the Gullett Elementary project cost?
TDLR lists an applicant-estimated project cost of $711,414 for the renovation. This is an estimate, not a reported final cost.
How large is the Gullett Elementary renovation?
The TDLR registration lists the renovation at 1,506 square feet.
What electrical work is listed at 6301 Treadwell Blvd?
Austin permit 2024-152653 EP, dated Nov. 29, 2024, records a 200-amp service upgrade with a new meter and load center.
Also being built nearby
All of 78757- 6303 Treadwell BlvdOct 1, 2026Replacement of complete existing central heat and air system with or without duct work · 9 m away
- 6300 Shoal Creek West DrNov 18, 2026Express: foundation repair - installing 21 exterior pilings · 51 m away
- 6307 Treadwell BlvdMay 20, 2026Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 56 m away
- 6206 Shoal Creek West DrJul 22, 2025Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 6204 Shoal Creek West DrJan 28, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 79 m away
- 6309 Treadwell BlvdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 6306 Shoal Creek West DrOct 29, 2025Replace and upgrade existing electrical servcie · 92 m away
- 6310 Treadwell BlvdNov 17, 2025Replacement of any self-contained packaged units rtu replacement on cafeteria · 99 m away
- 6202 Shoal Creek West DrNov 18, 2026Base: installing a backup battery system and additional meter socket · 101 m away
- 6311 Treadwell BlvdJun 14, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 6307 Shoal Creek West DrSep 29, 2026Warranty repair subfloor tunneling for repairs to pvc building drain and hangers one access hole and approximately 24 feet of excavation · 136 m away
- 6118 Bullard DrMar 12, 2024Express: repair fire/smoke damage/remove/replace sheetrock/new a/c ductwork/remove/replace fixture as needed/ remove/replace window and doors/remove/replace water heater · 140 m away
More warehouses & industrial in 78757, schools & daycares in 78757.