6324 Lamar Blvd
Austin, TX 78757
Crestview Highline site plan approved at 6324 Lamar Blvd
A City of Austin site-plan case for Crestview Highline at 6324 Lamar Blvd was approved and released on Feb. 26, 2024. The record does not specify the project type, square footage or valuation.
Summarized from City of Austin records · updated Feb 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 26, 2024
- since Feb 26, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 6324 Lamar Blvd
What is being built at 6324 Lamar Blvd?
City of Austin records show an approved and released site-plan case named Crestview Highline. The record does not describe what the project will include.
What is Crestview Highline in Austin?
Crestview Highline is the name on City of Austin site-plan case 11902480 for 6324 Lamar Blvd. The case was approved and released on Feb. 26, 2024.
When was the site plan for 6324 Lamar Blvd approved?
The City of Austin case for Crestview Highline was approved and released on Feb. 26, 2024.
How large is the Crestview Highline project?
The City of Austin record does not list a square footage for the Crestview Highline site-plan case.
What is being built near 6500 Nl?
A site-plan case named Crestview Highline was filed at 6324 Lamar Blvd, about 159 meters from 6500 Nl. The case was approved and released on Feb. 26, 2024, but the record does not specify the project details.
Also being built nearby
All of 78757- 6301 Lamar BlvdMar 2, 2007Shell convenience store · 68 m away
- 6222 Lamar BlvdMar 2, 2007Saeed ahmed wastewater improvements (withdrawal and resubmittal of sp-96-0262ds) · 69 m away
- 6222 N Lamar BlvdJun 3, 2024Roof replacement to existing residential treatment center · 69 m away
- 6416 Lamar BlvdNov 18, 2026Jci thred gills · 82 m away
- 6313 Wild StApr 19, 2024Upgrade main electric service and replace sub panel · 94 m away
- 6221 Lamar BlvdMay 26, 20266221 north lamar multifamily · 97 m away
- 721 Lamar PlAug 7, 2026Total demolition of 8770 sq ft multi-family building circa 1972.the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 101 m away
- 6309 Wild StSep 11, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 6411 Lamar BlvdMar 2, 2007Greater texas federal credit union · 116 m away
- 6215 N Lamar BlvdJul 31, 2026Per tx gas they are going to repair a gas leak on their line and while the line is temporarily down they want us to move the gas meter 10 feet out to the edge of the building and remove from the covered location its currently at · 116 m away
- 6500 N Lamar BlvdSep 15, 2025Underground network consisting of 24 and 108 diameter pipe restoration of concrete as required above ground installation of three (3) pickup kiosks and overhead cnaopy installation · 128 m away
- 905 Payne AveJun 9, 2025Interior remodel to move kitchen. 500 sq ft remodel · 131 m away