6700 Arroyo Seco
Austin, TX 78757
6700 Arroyo Seco: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6700 Arroyo Seco, Austin, TX 78757. The most recent, filed March 2, 2007, covers: “Brentwood elementary school addition, expansion and renovation”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 6700 Arroyo Seco
What is being built at 6700 Arroyo Seco?
The latest filing (City of Austin case 156012, March 2, 2007) covers brentwood elementary school addition, expansion and renovation.
How many permits and filings does 6700 Arroyo Seco have?
2 filings across 2 projects, from March 2, 2007 to March 2, 2007.
Is there other construction near 6700 Arroyo Seco?
Yes. Nearby filings include 6701 Arroyo Seco (install siding on youth annex install patio cover behind pastors annex. see attached document for detail. replace deck on youth annex with one that incorporates ada ramp. see attached document for detail, Jan 11, 2024); 1503 Choquette Dr (excavate up to 5 of tunnel under the home to make repairs up to 3 fixtures. includes one access pit in regular soil sewer repair up to 4 up to 5 repair on a max 4 sewer line includes excavation without obstacles up to 5 deep and 5 in length. 1 year warranty on repair, Apr 13, 2026); 1515 Ruth Ave (replacement of complete existing central heat and air system with or without duct work, Mar 25, 2024).
How do I get alerts for new permits at 6700 Arroyo Seco?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 6701 Arroyo SecoJan 11, 2024Install siding on youth annex install patio cover behind pastors annex. see attached document for detail. replace deck on youth annex with one that incorporates ada ramp. see attached document for detail · 83 m away
- 1503 Choquette DrApr 13, 2026Excavate up to 5 of tunnel under the home to make repairs up to 3 fixtures. includes one access pit in regular soil sewer repair up to 4 up to 5 repair on a max 4 sewer line includes excavation without obstacles up to 5 deep and 5 in length. 1 year warranty on repair · 101 m away
- 1515 Ruth AveMar 25, 2024Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 6703 Yates AveDec 3, 2021Brentwood elementary school · 149 m away
- 1504 Ruth AveJan 30, 2020Violet crown heights sec 2 blk i resub lots 8. 9 & e25 · 152 m away
- 1419 Dwyce DrJun 3, 2026Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 1417 Dwyce DrMay 5, 2026New construction of a detached studio/office please note reductions in flatwork for areas that are to be removed to comply with imp cover regulations · 170 m away
- 1703 Justin LnAug 15, 2024Emergency repair of riser and meter · 182 m away
- 1415 Dwyce DrNov 12, 2026Base: installing a backup battery system and additional meter socket · 188 m away
- 1701 Justin LnFeb 22, 2024Install evse · 192 m away
- 1500 Ruth AveFeb 5, 2026Unit a - replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton side discharge heat pump and gas furnace · 194 m away
- 1705 Justin LnOct 9, 2025Replacement of an existing water heater we are replacing a tankless water heater with another tankless water heater · 194 m away