6711 Lexington Rd
Austin, TX 78757
Sewer line replacement permitted at 6711 Lexington Road
City of Austin permits indicate sewer-line work beneath and around the home, permitted February 6, 2026. An electrical-service upgrade was permitted earlier, on June 11, 2024.
Summarized from City of Austin records · updated Feb 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 6, 2026
- since Jun 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under house about 65 feet and replace sewer lines under home we shd 40 pvc. also replace sewer yard line
- AppliedFeb 2, 2026
- IssuedFeb 6, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 18, 2026
Passed final inspection Mar 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel under house about 65 feet and replace sewer lines under home we shd 40 pvc. also replace sewer yard line
Tunnel under house about 65 feet and replace sewer lines under home we shd 40 pvc. also replace sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2026-012193 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade main electric service
Upgrade main electric service
City of Austin permitElectrical PermitFinal- Record
- 2024-072032 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6711 Lexington Rd
What work is permitted at 6711 Lexington Road?
A February 6, 2026 plumbing permit covers tunneling beneath the home to replace sewer lines and replacing a sewer line in the yard. A June 11, 2024 electrical permit covers an upgrade to the main electrical service.
When was the sewer work permitted at 6711 Lexington Road?
The City of Austin issued permit 2026-012193 PP on February 6, 2026. Its status is listed as Final.
Is a new building going up at 6711 Lexington Road?
The listed permits describe sewer-line work and an electrical-service upgrade at a home. They do not describe construction of a new building.
Was electrical work permitted at 6711 Lexington Road?
Yes. City of Austin electrical permit 2024-072032 EP, dated June 11, 2024, covers an upgrade to the main electrical service. Its status is listed as Final.
What does permit 2026-012193 PP cover?
The February 6, 2026 plumbing permit describes a tunnel of about 65 feet beneath the home to replace sewer lines, along with replacement of the sewer yard line. Its status is listed as Final.
Also being built nearby
All of 78757- 6801 Lexington RdApr 21, 2026Replace sewer line from house up to city tap using pvc pipe and fittings and connect sewer line at tap · 24 m away
- 6810 Pioneer PlMay 5, 2025Irrigation system installation · 49 m away
- 6812 Pioneer PlNov 17, 2026Installing an ev charger for city rebate · 49 m away
- 6814 Pioneer PlSep 10, 2026Base: installing a backup battery system and additional meter socket · 58 m away
- 6806 Pioneer PlAug 7, 2025Excavate 17 tunnel underneath home to replace drain line serving the laundry · 73 m away
- 2913 Stoneway DrNov 27, 2025Upgrading the electrical service from 125a to 200a. installing new lever-bypass meter can for overhead service · 76 m away
- 6807 Pioneer PlAug 12, 2024Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 6703 Lexington RdJul 7, 2026Tunnel under home to replace washer drain and kitchen drain up to the belly on the kitchen line. approximately 42 pipe replacement we will support plumbing under home per city code every 4 we will reattach to the system using a mechanical coupling approved by the city. then test our work to ensure no leaks are present · 92 m away
- 3101 Mohawk RdMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 6804 Pioneer PlNov 9, 2026Upgrade meter and service to 200a · 93 m away
- 6809 Pioneer PlApr 29, 2026Express: foundation repair · 93 m away
- 6805 Pioneer PlJun 4, 2025Emergency repair storm damage - service rebuild like for like ***storm related-emergency inspection done on 6/4/25. espa required-hyatt · 97 m away