6712 Shoal Creek Blvd
Austin, TX 78757
Drain-line plumbing work permitted at 6712 Shoal Creek Blvd
A City of Austin plumbing permit covers entry tunnels of about 25 feet to access and replumb cast-iron drain lines at 6712 Shoal Creek Blvd. The permit, 2026-065956 PP, was filed June 1, 2026, and is marked final.
Summarized from City of Austin records · updated Jun 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2026
- since Jun 1, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCreate entry tunnel(s) approx 25ft to replumb cast iron drain lines up to bottom of foundation and out to exterior cleanout
- AppliedMay 26, 2026
- IssuedJun 1, 2026
- WorkJun '26 – Jul '26
- Final inspectionJul 6, 2026
Passed final inspection Jul 6, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectCreate entry tunnel(s) approx 25ft to replumb cast iron drain lines up to bottom of foundation and out to exterior cleanout
Create entry tunnel(s) approx 25ft to replumb cast iron drain lines up to bottom of foundation and out to exterior cleanout
City of Austin permitPlumbing PermitFinal- Record
- 2026-065956 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6712 Shoal Creek Blvd
What work is permitted at 6712 Shoal Creek Blvd?
The permit describes entry tunnels of about 25 feet to access cast-iron drain lines and replumb them to the exterior cleanout.
When was the plumbing permit filed?
The City of Austin filed permit 2026-065956 PP on June 1, 2026. Its status is listed as final.
Is a new building being constructed at 6712 Shoal Creek Blvd?
The available record is for plumbing work, not new building construction. It describes work on cast-iron drain lines.
What does permit 2026-065956 PP cover?
It covers entry tunnels to access and replumb cast-iron drain lines up to the bottom of the foundation and out to an exterior cleanout.
Is the permit for a sewer-line repair?
The permit describes replumbing cast-iron drain lines. It does not identify the work as a sewer-line repair.
Also being built nearby
All of 78757- 6716 Shoal Creek BlvdSep 29, 2026T- pole for 6716 shoal creek blvd · 44 m away
- 6611 Lexington RdJan 11, 2026Install irrigation system · 45 m away
- 6613 Lexington RdMar 8, 2024Interior remodel and partial garage conversion · 51 m away
- 6615 Lexington RdMar 27, 2024Installation of irrigation system for front and backyard. poc (isolation valve double check master valve) will be located by water meter at street. controller will be located in garage. rain/freeze sensor will be located in optimal location for direct sunlight and non-obstructed. there will be 4 stations: 1 drip bed zone 1 drip turf zone 2 multi-stream turf zones · 58 m away
- 6711 Shoal Creek BlvdJul 13, 2025Repair service riser damaged due to storm damage · 60 m away
- 6706 Shoal Creek BlvdAug 17, 2026Sewer yard line repair roughly 50ft · 68 m away
- 6802 Pioneer PlAug 13, 2026Base: installing a backup battery system and additional meter socket · 79 m away
- 6717 Shoal Creek BlvdNov 17, 2026Removing the closet and converting the room from a bedroom to a study would not by itself require the room to maintain an egress able window. also includes removing two windows and converting the existing french door to a fixed window · 85 m away
- 6701 Lexington RdMar 4, 2026Express: foundation repair · 89 m away
- 6707 Shoal Creek BlvdMar 27, 2024Express: replace 4 windows like for like · 102 m away
- 6804 Pioneer PlNov 9, 2026Upgrade meter and service to 200a · 111 m away
- 6604 Lexington RdJul 9, 2026New detached covered back patio detached storage shed new flat work on rear side yard driveway ribbons and front stepping stones to connect the front porch to driveway ribbons · 112 m away