7004 Fort Hill Ct
Austin, TX 78757
7004 Fort Hill Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 7004 Fort Hill Ct, Austin, TX 78757. The most recent, filed November 6, 2024, covers: “Install grinder pump package”.
Compiled from City of Austin records · updated Nov 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2024
- since Nov 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall grinder pump package
- AppliedOct 23, 2024
- IssuedNov 6, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 19, 2024
Passed final inspection Nov 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall grinder pump package
Install grinder pump package
City of Austin permitPlumbing PermitFinal- Record
- 2024-142778 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7004 Fort Hill Ct
What is being built at 7004 Fort Hill Ct?
The latest filing (City of Austin permit 2024-142778 PP, November 6, 2024) covers install grinder pump package.
How many permits and filings does 7004 Fort Hill Ct have?
1 filing across 1 project, from November 6, 2024 to November 6, 2024.
What is being built near City Of Austin in Austin?
7004 Fort Hill Ct is about 117 m from City Of Austin (7011 Shoal Creek Boulevard). Its latest filing is for install grinder pump package.
Is there other construction near 7004 Fort Hill Ct?
Yes. Nearby filings include 7002 Fort Hill Ct (upgrade main service overhead 200 amp main breaker metercan riser grounding, Sep 29, 2026); 2907 Pinecrest Dr (ev charger install, Mar 3, 2026); 2902 Dover Pl (80 tunnel below the foundation to replace entire drain system. 3 access holes - front right left, Oct 5, 2026).
How do I get alerts for new permits at 7004 Fort Hill Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 7002 Fort Hill CtSep 29, 2026Upgrade main service overhead 200 amp main breaker metercan riser grounding · 35 m away
- 2907 Pinecrest DrMar 3, 2026Ev charger install · 58 m away
- 2902 Dover PlOct 5, 202680 tunnel below the foundation to replace entire drain system. 3 access holes - front right left · 64 m away
- 2914 Dover PlSep 18, 2026Express - remove and replace windows (same size) no structural changes. remove and replace exterior siding and trim revision-bathroom 1 remodel: new tub diverter valve tile shower surround vanity bathroom 2 remodel: new shower pan diverter valve tile shower surround vanity kitchen remodel: remove and replace cabinets and countertops electrical work: remove and replace all electrical plug outlets and switches install new recessed light fixtures revision 2 - main electrical panel change only the existing service is rated at 150 removing the existing 150 amp main breaker electrical panel. revision 3 - add mechanical trade need mechanical permit and trade contractor to install kitchen oven vent · 78 m away
- 2908 Pinecrest DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 87 m away
- 7006 Shoal Creek BlvdJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 2906 Pinecrest DrAug 20, 2024Tunneling under foundation to repair broken drain lines **per pc: all drain lines under house · 94 m away
- 3009 Pinecrest DrFeb 24, 2026Excavate 10 tunnel to repair main drain line under house · 94 m away
- 2907 Dover PlMar 4, 2024Deinstall/reinstall of existing solar system. ae. no changes being made · 102 m away
- 2904 Pinecrest DrMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 2901 Dover PlJul 25, 2024Upgrade overhead electrical service to 200amp · 110 m away
- 2909 Dover PlMar 12, 2024Addition of a trellis and uncovered wood deck to rear of existing 2-story sfr. interior remodel of kitchen living room and staircases · 111 m away