7308 Grover Ave
Austin, TX 78757
7308 Grover Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 7308 Grover Ave, Austin, TX 78757. The most recent, filed November 27, 2023, covers: “Gas test”.
Compiled from City of Austin records · updated Nov 27, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 27, 2023
- since Nov 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas test
- AppliedNov 22, 2023
- IssuedNov 27, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 12, 2023
Passed final inspection Dec 12, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas test
Gas test
City of Austin permitPlumbing PermitFinal- Record
- 2023-151184 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7308 Grover Ave
What is being built at 7308 Grover Ave?
The latest filing (City of Austin permit 2023-151184 PP, November 27, 2023) covers gas test.
How many permits and filings does 7308 Grover Ave have?
1 filing across 1 project, from November 27, 2023 to November 27, 2023.
Is there other construction near 7308 Grover Ave?
Yes. Nearby filings include 1202 Madison Ave (tunnel/sewer yardline repair under the foundation of the home roughly 30ft, Apr 14, 2025); 1206 Madison Ave (replace water sewer under the house and sewer yard line, Oct 27, 2025); 7309 Grover Ave ((tigelaar erin) - installation of circuit for elec. vehicle charging station - esip, Nov 10, 2026).
How do I get alerts for new permits at 7308 Grover Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1202 Madison AveApr 14, 2025Tunnel/sewer yardline repair under the foundation of the home roughly 30ft · 38 m away
- 1206 Madison AveOct 27, 2025Replace water sewer under the house and sewer yard line · 46 m away
- 7309 Grover AveNov 10, 2026(tigelaar erin) - installation of circuit for elec. vehicle charging station - esip · 47 m away
- 7401 Grover AveApr 20, 2026Express: foundation repair (10 sonotube piers shim n level) · 74 m away
- 1200 Pasadena DrApr 17, 202640 tunnel below the foundation to repair the sewer main bathrooms and kitchen and 3 tunnel below the foundation to re-route existing utility to yard sewer 2 access holes - front back · 81 m away
- 1207 Pasadena DrAug 2, 2025Addition and remodel construction of 487 sq ft addition to an existing residence consisting of a primary bedroom bathroom and new powder room with 200 sq ft loft remodel of the existing kitchen and screened porch as well as new front porch addition new driveway · 85 m away
- 1211 Madison AveJul 11, 2025Install an irrigation system to permit address · 88 m away
- 1203 Madison AveDec 18, 2024Express: insulation/drywall repair electrical repair · 88 m away
- 7403 Grover AveMar 5, 2025New main water service from water meter to home. trench will be backfilled upon completion of inspection. replacing the existing water service · 89 m away
- 7301 Grover AveAug 2, 2024Express: foundation repair · 95 m away
- 1209 Pasadena DrMay 28, 2024Addition to existing single family residential 1-story to include: new family room laundry room. 1 bedroom 1 bath and rear covered wood deck; interior stairs to new 2nd floor; new 2nd story addition to include: game room 1 bedroom 1 bath and storage area · 103 m away
- 7420 Wildcat PassAug 6, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 109 m away