7409 Shoal Creek Blvd
Austin, TX 78757
Foundation and plumbing repairs at Shoal Creek home
City of Austin permits indicate foundation repair at the home, permitted September 25, 2025, and a plumbing project to reroute a drain, permitted January 28, 2026. The plumbing work describes an approximately 12-foot tunnel from the exterior to the rear of the home.
Summarized from City of Austin records · updated Jan 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 28, 2026
- since Sep 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel from exterior and break concrete in rear of home to peplumb/reroute drain to exterior cleanout. approx 12ft tunnel
- AppliedJan 23, 2026
- IssuedJan 28, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 9, 2026
Passed final inspection Feb 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel from exterior and break concrete in rear of home to peplumb/reroute drain to exterior cleanout. approx 12ft tunnel
Tunnel from exterior and break concrete in rear of home to peplumb/reroute drain to exterior cleanout. approx 12ft tunnel
City of Austin permitPlumbing PermitFinal- Record
- 2026-008923 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-122027 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7409 Shoal Creek Blvd
What is happening at 7409 Shoal Creek Blvd?
City of Austin records show permits for foundation repair and plumbing work to reroute a drain at the home.
Is a new house being built at 7409 Shoal Creek Blvd?
The records provided do not identify new home construction. They list a foundation repair permit and a plumbing permit for drain work.
When were permits filed for 7409 Shoal Creek Blvd?
The foundation repair permit, 2025-122027 BP, was filed September 25, 2025. The plumbing permit, 2026-008923 PP, was filed January 28, 2026.
What foundation work is permitted at 7409 Shoal Creek Blvd?
A City of Austin building permit filed September 25, 2025, describes the work as foundation repair. Permit 2025-122027 BP is marked final.
What plumbing work is planned at 7409 Shoal Creek Blvd?
A plumbing permit filed January 28, 2026, describes tunneling about 12 feet from outside to the rear of the home and rerouting a drain to an exterior cleanout. Permit 2026-008923 PP is marked final.
Also being built nearby
All of 78757- 7407 Shoal Creek BlvdOct 2, 2025New pool and spa · 26 m away
- 7403 Shoal Creek BlvdNov 12, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replace existing system with one el18kcv060 outdoor condensing unit reconnect to existing electrical and refrigerant lines. no structural change · 49 m away
- 2900 Silverleaf DrJul 30, 2024Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 2802 Silverleaf CirSep 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5t horizontal two stage gas · 85 m away
- 2800 Silverleaf CirFeb 18, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 85 m away
- 7502 Shoal Creek BlvdJan 28, 2026Replacement of complete existing central heat and air system with or without duct work hallway mechanical closet · 85 m away
- 7402 Greenhaven DrFeb 7, 2025Construct new driveway approach of 18 ft and walkway of 4 lf · 90 m away
- 2900 Skylark DrFeb 13, 2026Replacement of complete existing central heat and air system with or without duct work 3 ton hvac replacement · 91 m away
- 7406 Greenhaven DrMay 6, 2024New 2-story sfr 4 bedrooms 3 bathrooms attached garage and covered porches · 96 m away
- 7408 Greenhaven DrNov 17, 2026Express: foundation repair-installing steel piers · 102 m away
- 7400 Greenhaven DrJun 16, 2026Installation of 26kw generator and 20 ng run · 101 m away
- 2902 Skylark DrDec 17, 2024105 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - 1 front 1 back 1 right · 104 m away