7614 Wildcat Pass: 1 project on record
City of Austin lists 1 filing across 1 project at 7614 Wildcat Pass, Austin, TX 78757. The most recent, filed November 20, 2023, covers: “Install evse at garage”.
Compiled from City of Austin records · updated Nov 20, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2023
- since Nov 20, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse at garage
- AppliedNov 16, 2023
- IssuedNov 20, 2023
- WorkNov '23 – May '24
- Final inspectionNov 21, 2023
Passed final inspection Nov 21, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse at garage
Install evse at garage
City of Austin permitElectrical PermitFinal- Record
- 2023-148586 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7614 Wildcat Pass
What is being built at 7614 Wildcat Pass?
The latest filing (City of Austin permit 2023-148586 EP, November 20, 2023) covers install evse at garage.
How many permits and filings does 7614 Wildcat Pass have?
1 filing across 1 project, from November 20, 2023 to November 20, 2023.
Is there other construction near 7614 Wildcat Pass?
Yes. Nearby filings include 7604 Wildcat Pass (replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas, Jun 4, 2026); 7411 Grover Ave (replacement of complete existing central heat and air system with or without duct work, Apr 13, 2026); 7403 Grover Ave (new main water service from water meter to home. trench will be backfilled upon completion of inspection. replacing the existing water service, Mar 5, 2025).
How do I get alerts for new permits at 7614 Wildcat Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 7604 Wildcat PassJun 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas · 42 m away
- 7411 Grover AveApr 13, 2026Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 7403 Grover AveMar 5, 2025New main water service from water meter to home. trench will be backfilled upon completion of inspection. replacing the existing water service · 81 m away
- 7601 Wildcat PassApr 25, 2024(gatlin travis) - installation of circuit for elec. vehicle charging station - esip · 89 m away
- 7401 Grover AveApr 20, 2026Express: foundation repair (10 sonotube piers shim n level) · 94 m away
- 7410 Grover AveNov 18, 2026Ev charger installation · 117 m away
- 7509 Wildcat PassApr 14, 2026Install nema 14-50 outlet to power customer-supplied ev charger inside detached garage. outlet to be hardwired to a 50a gfci breaker placed in main electric panel of service. includes a short trench from main electric panel on exterior wall of main home across the yard to the detached garage. outlet to be mounted inside detached garage · 117 m away
- 1200 Pasadena DrApr 17, 202640 tunnel below the foundation to repair the sewer main bathrooms and kitchen and 3 tunnel below the foundation to re-route existing utility to yard sewer 2 access holes - front back · 120 m away
- 7512 Pantherpaw StApr 8, 2024Replace prv · 140 m away
- 7420 Wildcat PassAug 6, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 141 m away
- 7400 Pantherpaw StOct 14, 2025Install a 60-amp 240 volt circuit and the 150-amp main panel using an available breaker slot. the proposed wire route is to run surface mounted conduit and hardware the tesla wall connector on the interior back left side wall of the garage · 154 m away
- 1203 Richcreek RdJan 29, 2024**construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 155 m away