groundranger
Recent · latest filing Apr 2026Residential

7703 Orangewood Cir

Austin, TX 78757

Home repairs and driveway work at 7703 Orangewood Cir

Permits at 7703 Orangewood Cir cover foundation repair, sewer-line replacement, and a new driveway approach and walkway. Austin records list the sewer permit on Feb. 7, 2026, the foundation permit on March 2, and the driveway permit on April 21. A separate permit from November 2024 covers replacement of the home’s central heating and air system.

Summarized from City of Austin records · updated Apr 21, 2026

Projects
4
4 filings
Latest filing
Apr 21, 2026
since Nov 13, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Demolition old driveway. construct new driveway approach of 10 ft and walkway of 4 lf

  1. AppliedApr 14, 2026
  2. IssuedApr 21, 2026
  3. WorkApr '26 – Jun '26
  4. Final inspectionJun 29, 2026

Passed final inspection Jun 29, 2026.

Permit & project history

4 projects
  1. Demolition old driveway. construct new driveway approach of 10 ft and walkway of 4 lf

    Demolition old driveway. construct new driveway approach of 10 ft and walkway of 4 lf

    City of Austin permitDriveway / SidewalksFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: foundation repair

    Express: foundation repair

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 59 feet of tunnel under house on slab. replacing sewer lines. 15 ft of sewer line in a trench

    59 feet of tunnel under house on slab. replacing sewer lines. 15 ft of sewer line in a trench

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of complete existing central heat and air system with or without duct work hvac change out

    Replacement of complete existing central heat and air system with or without duct work hvac change out

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7703 Orangewood Cir

What work is happening at 7703 Orangewood Cir?

Austin permits cover foundation repair, sewer-line replacement, and replacement of the existing driveway with a new driveway approach and walkway.

Is a new house being built at 7703 Orangewood Cir?

The listed permits describe repairs and driveway work at a residence. They do not describe construction of a new house.

When was the sewer work permitted at 7703 Orangewood Cir?

The sewer permit, 2026-014274 PP, is dated Feb. 7, 2026. It covers sewer-line replacement, including a tunnel under the house and a section in a trench.

What does the foundation repair permit cover?

Permit 2026-024481 BP, dated March 2, 2026, is for foundation repair at the residence.

Is the driveway being replaced at 7703 Orangewood Cir?

Yes. Permit 2026-045491 DS, dated April 21, 2026, describes demolition of the old driveway and construction of a 10-foot driveway approach and a 4-foot walkway.

Was HVAC work also permitted at this address?

Yes. A Nov. 13, 2024 permit covers replacement of the existing central heating and air system, with or without ductwork.

Also being built nearby

All of 78757

More demolitions in 78757.

Email me when a new permit is filed