8011 Parkdale Dr
Austin, TX 78757
8011 Parkdale Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8011 Parkdale Dr, Austin, TX 78757. The most recent, filed September 4, 2025, covers: “35 trench thru yard to replace yard sewer”.
Compiled from City of Austin records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled35 trench thru yard to replace yard sewer
- AppliedAug 4, 2025
- IssuedSep 4, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 19, 2025
Passed final inspection Sep 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project35 trench thru yard to replace yard sewer
35 trench thru yard to replace yard sewer
City of Austin permitPlumbing PermitFinal- Record
- 2025-097812 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8011 Parkdale Dr
What is being built at 8011 Parkdale Dr?
The latest filing (City of Austin permit 2025-097812 PP, September 4, 2025) covers 35 trench thru yard to replace yard sewer.
How many permits and filings does 8011 Parkdale Dr have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 8011 Parkdale Dr?
Yes. Nearby filings include 8012 Pinedale Cv (rebuild service to building for unit 1 and 2 with new gutter meter bases ext panels grounding and bonding, Jun 6, 2024); 8008 Pinedale Cv (rebuild service to building for unit a and b with new gutter meter bases ext panels grounding and bonding, Oct 22, 2024); 8012 Parkdale Dr ((hayden mario) - installation of circuit for elec. vehicle charging station - esip, May 19, 2026).
How do I get alerts for new permits at 8011 Parkdale Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8012 Pinedale CvJun 6, 2024Rebuild service to building for unit 1 and 2 with new gutter meter bases ext panels grounding and bonding · 43 m away
- 8008 Pinedale CvOct 22, 2024Rebuild service to building for unit a and b with new gutter meter bases ext panels grounding and bonding · 48 m away
- 8012 Parkdale DrMay 19, 2026(hayden mario) - installation of circuit for elec. vehicle charging station - esip · 51 m away
- 8101 Parkdale DrOct 22, 2026*addressing active code violation* interior remodel: open up kitchen area install new can lighting in house new siding; garage conversion to. add mech for vent hood · 51 m away
- 8006 Pinedale CvNov 5, 2024Side a tunnel below house replace cast iron plumbing with pvc plumbing. install new partial sewer line replacement · 61 m away
- 8100 Parkdale DrOct 1, 2026Blau - 39-99733 - install new 3.8 kw rooftop solar system to existing residential only using backfed breaker only · 68 m away
- 8004 Pinedale CvFeb 24, 2025No espa needed - add ev charger at main panel - eligible for ae rebate · 78 m away
- 8102 Parkdale DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 8003 Parkdale DrDec 18, 2023Retroactively permit addition of a carport to front of existing 1-story sfr. retroactively permit addition of a covered patio to rear of structure. retroactively permit conversion of attached garage into a bedroom bathroom and closet. retroactively permit interior remodel. reconfigure layout of kitchen. addition/remodel will result in a 4 bedroom 3 bathroom single family residence · 91 m away
- 8009 Pinedale CvApr 27, 202646 tunnel below the foundation to replace the drain lines to hall bath and branch to kitchen for unit a. 3 access holes - left left front. trench to repair the yard sewer · 94 m away
- 8104 Parkdale DrApr 8, 2026Lyon - 39-53920 - install new 5.76kw rooftop solar system to existing residential only using backfed breaker · 102 m away
- 8007 Logwood DrApr 15, 2024Upgrade 125amp oh service to 200amp oh service build · 104 m away