Rooftop solar and energy storage permitted at 8014 Tisdale Dr

Austin permits cover a new 8.925 kW rooftop solar system and 11.5 kW energy storage system for the existing home at 8014 Tisdale Dr. The solar and storage installation permit was filed June 26, 2026; an earlier permit filed August 20, 2024, covered power connections and a backup switch.

Summarized from City of Austin records · updated Jun 26, 2026

Projects
3
3 filings
Latest filing
Jun 26, 2026
since Aug 20, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 8.925kw rooftop solar system and 11.5kw energy storage system for existing residential only

  1. AppliedJul 25, 2024
  2. IssuedJun 26, 2026
  3. WorkJun '26 – Jun '26
  4. Final inspectionJun 26, 2026

Passed final inspection Jun 26, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install new 8.925kw rooftop solar system and 11.5kw energy storage system for existing residential only

    Install new 8.925kw rooftop solar system and 11.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install ev charger

    Install ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8014 Tisdale Dr

What is being built at 8014 Tisdale Dr?

Austin permit 2024-092257 EP covers a new 8.925 kW rooftop solar system and 11.5 kW energy storage system for the existing home.

Is 8014 Tisdale Dr getting solar panels?

Yes. A City of Austin permit filed June 26, 2026, covers installation of a rooftop solar system rated at 8.925 kW.

Is a home battery being installed at 8014 Tisdale Dr?

The June 26, 2026, permit also covers an 11.5 kW energy storage system.

When was the solar permit filed for 8014 Tisdale Dr?

The City of Austin filed permit 2024-092257 EP on June 26, 2026. Its status is listed as Final.

What work was permitted at 8014 Tisdale Dr in 2024?

Permit 2024-092262 EP, filed August 20, 2024, covered disconnecting and reconnecting power to tie in photovoltaic and energy storage components, plus a backup switch rated up to 200 amps.