groundranger
Recent · latest filing Aug 2026Residential

8019 Exmoor Dr

Austin, TX 78757

Water service and sewer-line work at 8019 Exmoor Dr

Austin permits indicate plumbing repairs at 8019 Exmoor Dr, including replacement of a main sewer line under the slab and new water service lines. The sewer permit was filed August 20, 2025, and two water-service permits were filed August 18, 2026.

Summarized from City of Austin records · updated Aug 18, 2026

Projects
3
3 filings
Latest filing
Aug 18, 2026
since Aug 20, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

New main water service line from water meter to transition fitting at home

  1. AppliedAug 7, 2026
  2. IssuedAug 18, 2026
  3. WorkAug '26 – Sep '26
  4. Final inspectionSep 18, 2026

Passed final inspection Sep 18, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. New main water service line from water meter to transition fitting at home

    New main water service line from water meter to transition fitting at home

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. New main water service from water meter to transition fitting at home

    New main water service from water meter to transition fitting at home

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 55 tunnel to expose and replace main sewer line under slab. tunnel access is located in backyard of unit b on right side of unit

    55 tunnel to expose and replace main sewer line under slab. tunnel access is located in backyard of unit b on right side of unit

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8019 Exmoor Dr

What work is happening at 8019 Exmoor Dr?

Austin permits describe replacement of a main sewer line under the slab and installation of new water service lines.

Is a new building being built at 8019 Exmoor Dr?

The records provided show plumbing work, not a permit for a new building.

When were permits filed for work at 8019 Exmoor Dr?

The sewer-line permit, 2025-101469 PP, was filed August 20, 2025. Two water-service permits, 2026-102685 PP and 2026-102681 PP, were filed August 18, 2026.

What does the sewer permit at 8019 Exmoor Dr cover?

Permit 2025-101469 PP describes tunneling to expose and replace the main sewer line under the slab, with access in the backyard of Unit B.

What do the water permits at 8019 Exmoor Dr cover?

Permits 2026-102685 PP and 2026-102681 PP describe new main water service lines from the water meter to a transition fitting at the home.

Also being built nearby

All of 78757
Email me when a new permit is filed