8212 Burrell Dr
Austin, TX 78757
8212 Burrell Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 8212 Burrell Dr, Austin, TX 78757 since October 3, 2024. The most recent, filed May 2, 2025, covers: “Request to disconnect. replacing riser in order to meet height requirements over the driveway. we will also be replacing the meter and main electrical panel in order to bring it up to current nec standards and do a complete grounding system and surge to meet all requirements”.
Compiled from City of Austin records · updated May 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 2, 2025
- since Oct 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect. replacing riser in order to meet height requirements over the driveway. we will also be replacing the meter and main electrical panel in order to bring it up to current nec standards and do a complete grounding system and surge to meet all requirements
- AppliedApr 28, 2025
- IssuedMay 2, 2025
- WorkMay '25 – May '25
- Final inspectionMay 16, 2025
Passed final inspection May 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect. replacing riser in order to meet height requirements over the driveway. we will also be replacing the meter and main electrical panel in order to bring it up to current nec standards and do a complete grounding system and surge to meet all requirements
Request to disconnect. replacing riser in order to meet height requirements over the driveway. we will also be replacing the meter and main electrical panel in order to bring it up to current nec standards and do a complete grounding system and surge to meet all requirements
City of Austin permitElectrical PermitFinal- Record
- 2025-051912 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-132186 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8212 Burrell Dr
What is being built at 8212 Burrell Dr?
The latest filing (City of Austin permit 2025-051912 EP, May 2, 2025) covers request to disconnect. replacing riser in order to meet height requirements over the driveway. we will also be replacing the meter and main electrical panel in order to bring it up to current nec standards and do a complete grounding system and surge to meet all requirements.
How many permits and filings does 8212 Burrell Dr have?
2 filings across 2 projects, from October 3, 2024 to May 2, 2025.
Is there other construction near 8212 Burrell Dr?
Yes. Nearby filings include 8210 Burrell Dr (replace sewer yard line from house connection to city tap, Oct 3, 2024); 8208 Burrell Dr (replace sewer yard line from house connection to city tap, Nov 6, 2024); 8206 Burrell Dr (replace sewer yard line from house connection to city tap, Oct 3, 2024).
How do I get alerts for new permits at 8212 Burrell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8210 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 3 m away
- 8208 Burrell DrNov 6, 2024Replace sewer yard line from house connection to city tap · 5 m away
- 8206 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 8 m away
- 8204 Burrell DrOct 3, 2024Replace sewer yard line from house connection to city tap · 11 m away
- 8202 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 14 m away
- 8200 Burrell DrOct 10, 2025Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 8305 Burrell DrDec 19, 202535ft tunnel sewer line repair underneath the foundation of the home · 69 m away
- 8311 Burrell DrOct 16, 2026Excavate 10 tunnel to repair the main drain under the house / excavate 10 trench to repair the main drain line in the yard · 80 m away
- 8313 Burrell DrJul 3, 2025Tunnel under foundation to replace cast iron drains with pvc. tunnel length under the foundation is approximately 70 feet with 3 access holes. sewer line replacement from the home to the city tap with pvc pipe · 84 m away
- 8315 Burrell DrOct 28, 2024New attached carport expand driveway approach in r.o.w · 87 m away
- 8317 Burrell DrJun 5, 2025Express - tub to shower conversion in hall bathroom replace sewer line under slab home · 91 m away
- 1803 Richwood DrOct 11, 2024Addition/remodel. addition of a covered screened porch to rear of existing 2-story sfr. remodel of existing single-family residence. reconfiguration of interior walls to add laundry upstairs and half bath downstairs. complete replacement of existing cast iron plumbing with new plumbing. addition/remodel will result in a 4 bedroom 3.5 bathroom single family residence · 97 m away