8312 Polar Dr
Austin, TX 78757
8312 Polar Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8312 Polar Dr, Austin, TX 78757. The most recent, filed May 3, 2024, covers: “Express: replacing windows like for like”.
Compiled from City of Austin records · updated May 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 3, 2024
- since May 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replacing windows like for like
- AppliedMay 3, 2024
- IssuedMay 3, 2024
- WorkMay '24 – May '24
- Final inspectionMay 29, 2024
Passed final inspection May 29, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replacing windows like for like
Express: replacing windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-055606 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8312 Polar Dr
What is being built at 8312 Polar Dr?
The latest filing (City of Austin permit 2024-055606 BP, May 3, 2024) covers express: replacing windows like for like.
How many permits and filings does 8312 Polar Dr have?
1 filing across 1 project, from May 3, 2024 to May 3, 2024.
Is there other construction near 8312 Polar Dr?
Yes. Nearby filings include 8316 Polar Dr (upgrade 200 amp meter add 200 amp panel ***this was an emergency inspection done in 5/2023 and was released to ae at the time new ec trying to activate to get final inspection done-hyatt, Mar 14, 2025); 8311 Polar Dr (relocate services conductor, Jul 3, 2025); 8318 Polar Dr (express: repair drywall over 128sqft in garage add two light fixtures in garage replace existing rotted door with same size and location, Nov 18, 2026).
How do I get alerts for new permits at 8312 Polar Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8316 Polar DrMar 14, 2025Upgrade 200 amp meter add 200 amp panel ***this was an emergency inspection done in 5/2023 and was released to ae at the time new ec trying to activate to get final inspection done-hyatt · 44 m away
- 8311 Polar DrJul 3, 2025Relocate services conductor · 49 m away
- 8318 Polar DrNov 18, 2026Express: repair drywall over 128sqft in garage add two light fixtures in garage replace existing rotted door with same size and location · 69 m away
- 8317 Burrell DrJun 5, 2025Express - tub to shower conversion in hall bathroom replace sewer line under slab home · 70 m away
- 8315 Burrell DrOct 28, 2024New attached carport expand driveway approach in r.o.w · 72 m away
- 8313 Burrell DrJul 3, 2025Tunnel under foundation to replace cast iron drains with pvc. tunnel length under the foundation is approximately 70 feet with 3 access holes. sewer line replacement from the home to the city tap with pvc pipe · 74 m away
- 1511 Villanova DrNov 2, 2026Express: replace 18 windows like for like · 75 m away
- 8311 Burrell DrOct 16, 2026Excavate 10 tunnel to repair the main drain under the house / excavate 10 trench to repair the main drain line in the yard · 76 m away
- 8300 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 77 m away
- 8302 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 77 m away
- 8304 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 78 m away
- 8306 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 78 m away