8403 Whittman Cv
Austin, TX 78757
8403 Whittman Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 8403 Whittman Cv, Austin, TX 78757. The most recent, filed November 27, 2023, covers: “Replace sanitary plumbing cast iron below slab tunnel excavation access”.
Compiled from City of Austin records · updated Nov 27, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 27, 2023
- since Nov 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sanitary plumbing cast iron below slab tunnel excavation access
- AppliedNov 22, 2023
- IssuedNov 27, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 7, 2023
Passed final inspection Dec 7, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace sanitary plumbing cast iron below slab tunnel excavation access
Replace sanitary plumbing cast iron below slab tunnel excavation access
City of Austin permitPlumbing PermitFinal- Record
- 2023-151041 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8403 Whittman Cv
What is being built at 8403 Whittman Cv?
The latest filing (City of Austin permit 2023-151041 PP, November 27, 2023) covers replace sanitary plumbing cast iron below slab tunnel excavation access.
How many permits and filings does 8403 Whittman Cv have?
1 filing across 1 project, from November 27, 2023 to November 27, 2023.
Is there other construction near 8403 Whittman Cv?
Yes. Nearby filings include 8404 Whittman Cv (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc, Jan 29, 2026); 1806 Ohlen Rd (replacement of an existing water heater, Aug 7, 2024); 8504 Putnam Dr (replacement of an existing water heater, Jul 12, 2024).
How do I get alerts for new permits at 8403 Whittman Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8404 Whittman CvJan 29, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 40 m away
- 1806 Ohlen RdAug 7, 2024Replacement of an existing water heater · 59 m away
- 8504 Putnam DrJul 12, 2024Replacement of an existing water heater · 66 m away
- 8411 Whittman CvJun 1, 2026Upgrading the existing service and replacing panels to both units · 69 m away
- 1811 Ohlen RdJan 12, 2024Emergency upgraded overhead service taken down by a tree · 79 m away
- 8305 Renton DrApr 14, 2025Emergency repair of riser to restore power. ***emergency inspection done on 4/8/25 no espa required/no meter work done-hyatt · 97 m away
- 8301 Renton DrMar 5, 2025Tunnel under slab approximately 70 to expose and replace entire cast iron sewer line under home. tunnel with have two access holes with one being in the front of the home and the other in the rear of the home · 101 m away
- 1805 Ohlen RdFeb 14, 202560 tunnel below the foundation to replace entire cast-iron drain system. 3 access holes - front right back · 103 m away
- 8510 Putnam DrFeb 26, 202650 tunnel below the foundation to replace entire drain system. 2 access holes - front back · 104 m away
- 8503 Putnam DrAug 5, 2024Replacement of an existing water heater · 112 m away
- 8411 Kimble CvMar 17, 2026Interior remodel and garage conversion of sfr · 130 m away
- 8514 Putnam DrApr 7, 2025Rebuild main electrical service · 136 m away