40-gallon water heater replacement at 8409 Rockwood Ln
An Austin plumbing permit covers replacement of an existing 40-gallon water heater at 8409 Rockwood Ln. The permit was filed September 30, 2026, and is listed as final.
Summarized from City of Austin records · updated Sep 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 30, 2026
- since Sep 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 40 gal water heater change out 8409 rockwood lane austin tx 78757
- AppliedSep 18, 2026
- IssuedSep 30, 2026
- WorkSep '26 – Nov '26
- Final inspectionNov 2, 2026
Passed final inspection Nov 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater 40 gal water heater change out 8409 rockwood lane austin tx 78757
Replacement of an existing water heater 40 gal water heater change out 8409 rockwood lane austin tx 78757
City of Austin permitPlumbing PermitFinal- Record
- 2026-123024 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8409 Rockwood Ln
What work is planned at 8409 Rockwood Ln?
An Austin plumbing permit covers replacing an existing 40-gallon water heater. Permit 2026-123024 PP was filed September 30, 2026.
Is a new home being built at 8409 Rockwood Ln?
The available record is for a water heater replacement, not new home construction. It is listed as a plumbing permit.
When was the water heater permit filed for 8409 Rockwood Ln?
The permit was filed September 30, 2026. The record lists its status as final.
What size water heater is being replaced at 8409 Rockwood Ln?
The permit description specifies a 40-gallon water heater replacement.
What is the permit number for work at 8409 Rockwood Ln?
The permit number is 2026-123024 PP. The City of Austin record describes a replacement of an existing 40-gallon water heater.
Also being built nearby
All of 78757- 8405 Rockwood LnOct 30, 2025Tunnel under foundation to replace cast iron pipe for one full bathroom and main drain line. total lenght of pipe replaced is 45 feet and total length of tunnel is approximately 45 feet. 2 access holes will be made one in the front and one in the back · 42 m away
- 8404 Briarwood LnMay 7, 2026Excavate 7 tunnel to repair main drain line under house excavate 43 trench to repair drain line in yard · 59 m away
- 3001 Stanwood DrJun 23, 2025Tunnel and replace under house cast iron sewer · 60 m away
- 8412 Briarwood LnJan 27, 2026Express: replace 9 windows (size for size) 1 existing entry door (size for size) · 63 m away
- 8414 Briarwood LnMay 8, 2026We will be excavating a 42ft trench to replace the sewer line · 80 m away
- 8413 Briarwood LnJan 8, 2026Install level 2 ev charger · 97 m away
- 8405 Briarwood LnMar 25, 2024Install irrigation system · 97 m away
- 8312 Rockwood LnOct 21, 2024Fixed a gas leak in line at meter between meter and interior lin. about a foot of gas line repaired · 98 m away
- 8310 Rockwood LnFeb 25, 2025Create entry holes and tunnel to replace drain system under foundation and up to bottom of foundation and out to exterior cleanout · 114 m away
- 8311 Rockwood LnJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 8415 Briarwood LnMay 9, 2024Installation of a level 2 hardwire ev charger from outside panel using seu 4 wire through the attic to a non-fusible disconnect on charger wall and finish the run using 6/3 copper romex wire and putting a 60amp breaker for the charger · 120 m away
- 8310 Briarwood LnJun 9, 2025Install automatic irrigation system · 126 m away