8410 Burrell Dr
Austin, TX 78757
8410 Burrell Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 8410 Burrell Dr, Austin, TX 78757 since April 23, 2024. The most recent, filed January 14, 2025, covers: “40 replacement of building drain tunneling under the drain under the whole house”.
Compiled from City of Austin records · updated Jan 14, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jan 14, 2025
- since Apr 23, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projects40 replacement of building drain tunneling under the drain under the whole house
40 replacement of building drain tunneling under the drain under the whole house
City of Austin permitPlumbing PermitFinal- Record
- 2025-004515 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-153694 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Abandon 3/4 hot line after the shutoff that i installed 90 up and over through the attic and down behind the freezer stub out the wall next to existing hose bib down into ground trenching to the existing pipe
Abandon 3/4 hot line after the shutoff that i installed 90 up and over through the attic and down behind the freezer stub out the wall next to existing hose bib down into ground trenching to the existing pipe
City of Austin permitPlumbing PermitFinal- Record
- 2024-049282 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8410 Burrell Dr
What is being built at 8410 Burrell Dr?
The latest filing (City of Austin permit 2025-004515 PP, January 14, 2025) covers 40 replacement of building drain tunneling under the drain under the whole house.
How many permits and filings does 8410 Burrell Dr have?
3 filings across 3 projects, from April 23, 2024 to January 14, 2025.
Is there other construction near 8410 Burrell Dr?
Yes. Nearby filings include 8408 Burrell Dr (replace sewer yard line from house connection to city tap, Dec 3, 2024); 8406 Burrell Dr (replace sewer yard line from house connection to city tap, Dec 3, 2024); 8404 Burrell Dr (replace sewer yard line from house connection to city tap, Dec 3, 2024).
How do I get alerts for new permits at 8410 Burrell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 8408 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 13 m away
- 8406 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 35 m away
- 8404 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 58 m away
- 1522 Weyford DrOct 14, 2025New inground swimming pool with reqd enclosure device for existing 1-story single family residence · 63 m away
- 8411 Kimble CvMar 17, 2026Interior remodel and garage conversion of sfr · 65 m away
- 8409 Kimble CvApr 18, 2025Upgrade electrical service · 75 m away
- 1521 Weyford DrJul 25, 2024Excavate to replace the sewer line in the yard from the house to the city tap or easement · 76 m away
- 8402 Burrell DrSep 9, 2026Replacement of an existing water heater · 80 m away
- 1520 Weyford DrMay 11, 2026Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 1805 Ohlen RdFeb 14, 202560 tunnel below the foundation to replace entire cast-iron drain system. 3 access holes - front right back · 87 m away
- 8500 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 90 m away
- 8407 Kimble CvMar 24, 2025We will be tunneling underneath the house to repair plumbing pipes below the slab **we will start the tunnel on the right hand side of the house. well be digging 6 feet(deep) by 3 feet (wide) · 92 m away