8500 Contour Dr
Austin, TX 78757
8500 Contour Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8500 Contour Dr, Austin, TX 78757. The most recent, filed February 28, 2025, covers: “Tunnel under home to replace approximately 75ft of main sewer line. wholes house under slab cast iron replacement”.
Compiled from City of Austin records · updated Feb 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 28, 2025
- since Feb 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under home to replace approximately 75ft of main sewer line. wholes house under slab cast iron replacement
- AppliedFeb 20, 2025
- IssuedFeb 28, 2025
- WorkFeb '25 – Apr '25
- Final inspectionApr 7, 2025
Passed final inspection Apr 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under home to replace approximately 75ft of main sewer line. wholes house under slab cast iron replacement
Tunnel under home to replace approximately 75ft of main sewer line. wholes house under slab cast iron replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-020633 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8500 Contour Dr
What is being built at 8500 Contour Dr?
The latest filing (City of Austin permit 2025-020633 PP, February 28, 2025) covers tunnel under home to replace approximately 75ft of main sewer line. wholes house under slab cast iron replacement.
How many permits and filings does 8500 Contour Dr have?
1 filing across 1 project, from February 28, 2025 to February 28, 2025.
Is there other construction near 8500 Contour Dr?
Yes. Nearby filings include 1517 Fairfield Dr (60 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - 1 back at kitchen 1 left at bathroom, Mar 18, 2025); 8502 Contour Dr (sewer line replacement, May 13, 2025); 1520 Weyford Dr (replacement of complete existing central heat and air system with or without duct work, May 11, 2026).
How do I get alerts for new permits at 8500 Contour Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1517 Fairfield DrMar 18, 202560 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - 1 back at kitchen 1 left at bathroom · 26 m away
- 8502 Contour DrMay 13, 2025Sewer line replacement · 27 m away
- 1520 Weyford DrMay 11, 2026Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 1522 Weyford DrOct 14, 2025New inground swimming pool with reqd enclosure device for existing 1-story single family residence · 60 m away
- 1512 Weyford DrJun 3, 2025Excavate roughly 80 feet under the foundation of the home to expose all cast iron sewer lines. once exposed cut out all exposed plumbing and replace using schedule 40 pvc. hang all new pipe per code using clevis hangers. also excavate roughly 20 feet of the outside sewer yard line and replace using schedule 40 pvc bed in new line using sand per code · 80 m away
- 8508 Contour DrAug 6, 2024Replacement of complete existing central heat and air system · 82 m away
- 1511 Fairfield DrJul 10, 2025Create entry tunnel to replumb cast iron with pvc for kitchen bathroom and laundry drain line up to bottom of foundation and out to exterior cleanout · 84 m away
- 8503 Contour DrSep 30, 2025Install sprinkler system · 90 m away
- 1521 Weyford DrJul 25, 2024Excavate to replace the sewer line in the yard from the house to the city tap or easement · 96 m away
- 1509 Fairfield DrMay 8, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 8500 Burrell DrDec 3, 2024Replace sewer yard line from house connection to city tap · 107 m away
- 8505 Contour DrAug 30, 2024Residential solar installation of 8.4 kw system · 107 m away